MarineLink.com - latest marine news  
May 17, 2008         






 

Port of LA Re-Releases the Draft Environmental Impact Report

Monday, May 05, 2008
Port Begins Public Comment Period and Announces June 5 Public Meeting to Present Project Overview and Receive Public Comments
The Port of Los Angeles has posted the Re-circulated Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR) for the proposed Berth 97-109 Container Terminal Project (China Shipping). With the posting of the draft document, a public comment period is now in effect until close of business day June 30, 2008. The Port will hold a public meeting on June 5, 2008, at 6:00 p.m. at Banning’s Landing Community Center, 100 East Water Street, in Wilmington. At the meeting, Port staff will present an overview of the proposed project and receive ublic comments.
The DEIS/DEIR is a re-circulation of the original DEIS/DEIR released in 2006. It includes a re-assessment of existing project components, assessment of proposed components, and new environmental measures in response to community feedback on the previously released DEIS/DEIR.
The Re-circulated Draft DEIS/DEIR illustrates how the Port proposes to substantially reduce air emissions at the terminal as part of a proposed expansion that could create more than 900 construction jobs during the project, and 4,000 new jobs upon full build-out. The estimated emission reductions between the proposed project without environmental controls beyond state and federal regulations as compared to the proposed project with a broad range of air reduction measures applied by the Port of Los Angeles yields a 95% reduction in sulfur oxide (SOx) emissions (a common ship exhaust pollutant), a 52% reduction in oxides of nitrogen (NOx) emissions, and PM (Particulate Matter) emissions reductions of 71% and 79% for PM10 and PM2.5 (respectively).
Phase II and Phase II of the project are estimated to cost $106,300,000. The first phase cost $100,200,000 for terminal assets already in place.
The project proposes aggressive measures to reduce air pollution, including shore-to-ship electric power (AMP) while vessels are at berth, use of low sulfur fuel on ships, and use of clean trucks, solar panels, and alternative-fueled yard equipment. The proposed project also includes several community beautification initiatives, including the development of a new community park in San Pedro (Plaza Park), implementing a Beautification Plan along area corridors, and extensive landscaping along Front Street, which runs parallel to the terminal perimeter.
The June 5th public meeting is part of the Re-circulated DEIS/DEIR process. At the meeting, the public will be informed of the potential significant environmental effects of the proposed project and project alternatives, and public comment on the project will be taken and documented for consideration in the Final Environmental Impact Statement/Final Environmental Impact Report (FEIS/FEIR).
Copies of the Re-circulated DEIS/DEIR document are available online at the Port’s website, www.portoflosangeles.org .

Related Strories
Strike Blocks Tankers in France
Daewoo, Galfar Win $442m Oman Port Deal
LA to Break Ground on Port Police HQ
Rep. Nadler Announces Deal to Keep Red Hook Port Open
TSA Announces Enrollment Dates for the TWIC at Various Ports
 
 
 
FREE Marine Magazines Subscription
 

Teekay Announces Dividend May 16 2008 8:23AM

Ananda Shipyard to Deliver First Ship May 16 2008 8:23AM

Putin Pushes Russian Shipbuilding Reform May 16 2008 8:23AM

Energy Efficient Ships Addressed by GL May 16 2008 8:21AM

Strategic Marine Wins Tug Deal May 16 2008 8:20AM

Wärtsilä Expands in Norway May 16 2008 8:20AM

Rigdon Christens Slap Shot May 16 2008 8:19AM

Coast Guard, Sheriff Dept. Sign Agreement May 16 2008 8:18AM

MJP Wins Record Order in S. Korea May 16 2008 8:16AM

Conrad Announces 1Q Results May 16 2008 8:13AM

EB Wins Navy Funds May 16 2008 8:10AM

This Day in Naval History - May 16 May 16 2008 8:00AM

Marine construction project gone wrong May 16 2008 7:51AM

Oil Spill Bill Forwarded May 16 2008 7:50AM

Bill introduced to reauthorize MARAD May 16 2008 7:48AM

SCC Meeting Set May 16 2008 7:44AM

GE Gas Turbine Powers First National Security Cutter May 15 2008 12:15PM

Evergreen/COSCON Upgrade China/Persian Gulf Services May 15 2008 10:24AM

Teekay Reports 1Q Results May 15 2008 10:22AM

MAN Diesel Service Center Opens in NJ May 15 2008 10:19AM

© 1996-2007 Maritime Activity Reports, Inc.
Developer: Vladimir Bibik