Marine Link
Monday, September 26, 2016

Halter Begins Construction of Three Second Generation Hvide SDM

August 27, 1999

Halter Marine, Inc. has begun construction of three second generation Ship Docking Modules (SDM) at its Lockport, La. shipyard for Hvide Marine, Inc. The new tugs, designated SDM Mark II, follow the three original Halter-built SDMs, New River, St. Johns and Escambia. Two of the new vessels, Suwanee River and Peace River, are scheduled for delivery in 1999, and Kissimmee River, the third Mark II, will be delivered in 2000. The patented, double-ended 90 x 50 ft. SDM design, which requires only two crew members to operate, was conceived by Erik Hvide, chairman and president of Hvide Marine and refined by the Elliot Bay Design Group, Seattle, Wash. The design is critical to maneuvering large ships in and out of narrow ports and harbors.


Maritime Reporter Magazine Cover Sep 2016 - Maritime & Ship Security

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News