Marine Link
Monday, September 26, 2016

NASSCO Starts Construction of Sixth T-AKE Ship

December 8, 2006

General Dynamics (GD) NASSCOannounced the start of construction on the sixth dry cargo-ammunition ship in the U.S. Navy's T-AKE program. The ship is scheduled to be delivered to the Navy in the fourth quarter of 2008. The lead ship of the class, USNS Lewis and Clark (T-AKE 1), was delivered to the Navy last June. The second ship, USNS Sacagawea, will go to sea for Builder's Trials on December 14 and will be delivered to the Navy in the first quarter of 2007. The third ship, USNS Alan Shepard, was launched on December 6, and is scheduled to be delivered in the second quarter of 2007. The fourth and fifth T-AKE ships, currently under construction, are the Richard E. Byrd and Robert E. Peary, respectively. The T-AKE ships are 210 meters (689 feet) in length and 32.2 meters (105.6 feet) in beam, with a design draft of 9.12 meters (29.9 feet) and a displacement of 41,000 metric tons. NASSCO has incorporated international marine technologies and commercial ship-design features into the ships, including an integrated electric-drive propulsion system, to minimize operating costs over their projected 40-year service life.


Maritime Reporter Magazine Cover Sep 2016 - Maritime & Ship Security

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News