UK MARS (Mariners' Alerting and Reporting Scheme} recently analysed the case of a fatal injury sustained by a seamen when the mooring rope of a 85,000 dwt mooring rope he was tending suddenly parted.

Background
Before arrival, the Master conducted a meeting to brief officers on the mooring plan and the constraints at the port. The vessel, an 85,000 ton bulk carrier, is provided with 16 mooring lines on mooring drums. As it was, the vessel was not accommodated along her full length of 287 metres at the berth; her aft section was to overhang the end of the berth by about 20 metres. The plan was to berth the vessel 6-3-3 forward and aft. This mooring could be achieved by doubling the existing ropes and the mooring plan agreed with the pilot.



The lead of all mooring lines was relatively short as the vessel was not berthed with her full length alongside the berth. The Master protested to the agents and charterers immediately after berthing about the inadequacy of moorings and the unsafe conditions for rigging the gangway.



The accident
Some time after berthing it was observed that the vessel’s bow had come off the berth by about one metre. The third mate and an OS proceeded to the forecastle deck and the second mate and one AB proceeded aft. To bring the bow alongside, the third mate heaved on the starboard breast line and second mate slackened the stern lines.

Then third mate proceeded to heave up a head line and the OS was asked to heave up the starboard breast line. Within 10-15 seconds of the OS being asked to heave up the starboard breast line a loud sound of parting rope was heard. The third mate immediately came to the starboard side where he observed the OS, prone and bleeding between the mooring winch and the control stand.



The broken mooring rope was a 70mm diameter polypropylene monofilament 8-strand plaited rope and on visual examination found to be in general good condition. The rope was found to have parted at a point about 14 metres from the eye. As a result of being hit on the head by the parted breast line the OS was declared dead at the hospital that same evening. 


Contributing factors

  • The OS, although holding a qualification as an Efficient Deck Hand (EDH) and having been given awareness training for the mooring equipment on this vessel had only recently been promoted to OS from steward. He had little experience of tending to the moorings of a large vessel in such difficult environmental circumstances.

  • The plan of mooring equipment at forecastle deck shows that the breast line is passed through the pedestal roller fitted aft of the mooring winch on deck. In this arrangement the winch operator’s position is in the snap back zone of the breast line.
  • It is likely that the OS did not realise that he was standing in the snap back zone for the rope he was hauling as the snap back markings were no longer clearly marked on deck.

  • The head line that the third officer was hauling was approximately twice the length of the line that the OS was working, already pretensioned during initial efforts to bring the ship back alongside. Although the ropes were of similar materials it is likely that the shorter length of rope acting as the breast line began taking on a breaking load while the forward head line was still taking up the elasticity of the rope.

  • The lead of all mooring lines was relatively short. This reduced the length of wharf available. The vessel was also unable to heave on her stern lines and bow lines simultaneously to keep the vessel alongside as the overhang would have resulted in the stern moving in and the bow moving out.

  • Coordination between the terminal, pilots and the vessel was poorly managed and did not provide for safe berthing of the vessel. The issues with inadequate mooring arrangements, safe access and egress and the commercial pressures of starting cargo operations all stretched senior management onboard. This resulted in confusion, incomplete preparation and inadequate shore-to-ship coordination. This failure also carried over to the following evening when another rope failed at the next high flood tide. This time the rope was not being attended to.

  • Given the size of the ship, reduced wharfage and tidal currents, the most appropriate action would have been to have a tug standing by during the manoeuvres.

 

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Coast Guard Foundation to Honor USCG in Miami

The Coast Guard Foundation, a nonprofit organization committed to the education and welfare of all Coast Guard members and their families, announced today that

Maritime Broadband Opens Office in Greece

Maritime Broadband has expanded its worldwide footprint by opening an office, Maritime Broadband Hellas, in Athens, Greece. The new office addresses the growing

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

News

PES to Begin Operating Benzene Terminal in November

Philadelphia Energy Solutions plans to start operating a new benzene offtake terminal next month at its 335,000-barrel-per-day refinery in Philadelphia, two people familiar with the plans said.

Coast Guard Foundation to Honor USCG in Miami

The Coast Guard Foundation, a nonprofit organization committed to the education and welfare of all Coast Guard members and their families, announced today that

Sunken Barge Salvage Stops Traffic on Chicago River

The U.S. Coast Guard said it is restricting vessel traffic on the Chicago River to allow for salvage of a sunken barge. All cargo has been removed from the sunken

Maritime Safety

Sunken Barge Salvage Stops Traffic on Chicago River

The U.S. Coast Guard said it is restricting vessel traffic on the Chicago River to allow for salvage of a sunken barge. All cargo has been removed from the sunken

USCG Reopens Port Allen Post Hurricane Ana

The Coast Guard Captain of the Port reopened Port Allen in Kauai Monday morning after surveying crews deemed it  safe for transit. The maritime public is advised

Mitsubishi Super Skiving System

Mitsubishi Heavy Industries, Ltd. (MHI) has completed development of the "Mitsubishi Super Skiving System" for machining internal gears with high speed and outstanding precision.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1983 sec (5 req/sec)