Bulk Carrier Mooring Fatal Accident Probed

MarineLink.com
Thursday, December 19, 2013
Rendering courtesy of MARS

UK MARS (Mariners' Alerting and Reporting Scheme} recently analysed the case of a fatal injury sustained by a seamen when the mooring rope of a 85,000 dwt mooring rope he was tending suddenly parted.

Background
Before arrival, the Master conducted a meeting to brief officers on the mooring plan and the constraints at the port. The vessel, an 85,000 ton bulk carrier, is provided with 16 mooring lines on mooring drums. As it was, the vessel was not accommodated along her full length of 287 metres at the berth; her aft section was to overhang the end of the berth by about 20 metres. The plan was to berth the vessel 6-3-3 forward and aft. This mooring could be achieved by doubling the existing ropes and the mooring plan agreed with the pilot.



The lead of all mooring lines was relatively short as the vessel was not berthed with her full length alongside the berth. The Master protested to the agents and charterers immediately after berthing about the inadequacy of moorings and the unsafe conditions for rigging the gangway.



The accident
Some time after berthing it was observed that the vessel’s bow had come off the berth by about one metre. The third mate and an OS proceeded to the forecastle deck and the second mate and one AB proceeded aft. To bring the bow alongside, the third mate heaved on the starboard breast line and second mate slackened the stern lines.

Then third mate proceeded to heave up a head line and the OS was asked to heave up the starboard breast line. Within 10-15 seconds of the OS being asked to heave up the starboard breast line a loud sound of parting rope was heard. The third mate immediately came to the starboard side where he observed the OS, prone and bleeding between the mooring winch and the control stand.



The broken mooring rope was a 70mm diameter polypropylene monofilament 8-strand plaited rope and on visual examination found to be in general good condition. The rope was found to have parted at a point about 14 metres from the eye. As a result of being hit on the head by the parted breast line the OS was declared dead at the hospital that same evening. 


Contributing factors

  • The OS, although holding a qualification as an Efficient Deck Hand (EDH) and having been given awareness training for the mooring equipment on this vessel had only recently been promoted to OS from steward. He had little experience of tending to the moorings of a large vessel in such difficult environmental circumstances.

  • The plan of mooring equipment at forecastle deck shows that the breast line is passed through the pedestal roller fitted aft of the mooring winch on deck. In this arrangement the winch operator’s position is in the snap back zone of the breast line.
  • It is likely that the OS did not realise that he was standing in the snap back zone for the rope he was hauling as the snap back markings were no longer clearly marked on deck.

  • The head line that the third officer was hauling was approximately twice the length of the line that the OS was working, already pretensioned during initial efforts to bring the ship back alongside. Although the ropes were of similar materials it is likely that the shorter length of rope acting as the breast line began taking on a breaking load while the forward head line was still taking up the elasticity of the rope.

  • The lead of all mooring lines was relatively short. This reduced the length of wharf available. The vessel was also unable to heave on her stern lines and bow lines simultaneously to keep the vessel alongside as the overhang would have resulted in the stern moving in and the bow moving out.

  • Coordination between the terminal, pilots and the vessel was poorly managed and did not provide for safe berthing of the vessel. The issues with inadequate mooring arrangements, safe access and egress and the commercial pressures of starting cargo operations all stretched senior management onboard. This resulted in confusion, incomplete preparation and inadequate shore-to-ship coordination. This failure also carried over to the following evening when another rope failed at the next high flood tide. This time the rope was not being attended to.

  • Given the size of the ship, reduced wharfage and tidal currents, the most appropriate action would have been to have a tug standing by during the manoeuvres.

 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

INTERSCHALT Expands Africa, Asia Service Networks

INTERSCHALT maritime systems AG, the provider of maritime software, services and supplier of Voyage Data Recorders (VDR 4G[e] and s-VDR) has expanded its network

Access to Brazil's Itajai Port to Open as Truck Protest Ends

Protesters have agreed to open access to Brazil's main poultry exporting port of Itajai in Santa Catarina state, the port said on Wednesday, ending a lingering

E-marine Begins Fleet Expansion

E-marine, a provider of submarine cable installation and repair solutions in the Middle East and Sub-Continent region, has unveiled plans to expand its fleet of cable ships in 2015,

News

Ten Migrants Die in Mediterranean, a Thousand Rescued

At least 10 North African migrants died when their rubber boat overturned in the southern Mediterranean while almost a thousand more from a total of seven vessels

Harbor Police Rescues Stranded Sea Lion

Sea lions are a common sight in San Diego Bay, but a sea lion wandering a busy roadway and then ending up in the back of a patrol car is slightly rarer.   The

INTERSCHALT Expands Africa, Asia Service Networks

INTERSCHALT maritime systems AG, the provider of maritime software, services and supplier of Voyage Data Recorders (VDR 4G[e] and s-VDR) has expanded its network

Maritime Safety

Ten Migrants Die in Mediterranean, a Thousand Rescued

At least 10 North African migrants died when their rubber boat overturned in the southern Mediterranean while almost a thousand more from a total of seven vessels

Propulsion is the Next Step for Survitec's MES

The company that launched the world's first MES is now actively developing an Alternative Escape System (AES) for large passenger ships.  Survitec Group wants

Cosco Boxship Detained Over Illegal Arms

Colombian authorities detained a vessel operated by China's largest shipping group for illegally transporting thousands of cannon shells, about 100 tonnes of gunpowder

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2127 sec (5 req/sec)