Tarua 120: New Addition to Ramparts 2800 Class

Press Release
Friday, September 28, 2012

In July 2012, Tarua 120 was delivered by shipyard Italthai Marine Limited to her owners, the Port Authority of Thailand. 

 

This is the latest of the RAmparts 2800 Class Tugs to be built to this widely accepted design from Robert Allan Ltd., Naval Architects of Vancouver, B.C. and is the first tug to be built to a Robert Allan Ltd. design in Thailand. Working in close cooperation with shipyard personnel, the standard Ramparts 2800 design is customized to meet the Port Authority of Thailand’s requirements for propulsion equipment, accommodations, tank capacities and outfit.


Particulars of Tarua 120 are as follows:
 

  • Length overall:     28.2m
  • Beam, moulded:     11.5m
  • Depth, moulded:     5.35m
  • Maximum draft (overall):    5.0m


Tank Capacities are as follows:
 

  • Fuel oil:     63.0 m3
  • Potable Water:     20.2 m3
  • Main engine lube oil:      3.1 m3
  • Z-drive lube oil:     0.4 m3
  • Hydraulic oil:     1.0 m3
  • Sludge Tank:     2.0 m3
  • Grey Water:     3.4 m3
  • Sewage holding tank:     3.4 m3
  • Foam:     8.6 m3


The vessel has been outfitted to high standards for a crew of up to 10 people. The large main deckhouse contains a well sized combined lounge/mess room, galley, two officer cabins with shared en-suite.  The lower deck contains 1 x 2 man cabin and 1 x 6 man cabin.  The wheelhouse is designed for maximum all-round visibility with forwards and aft control stations providing maximum visibility to both fore and aft deck working areas.

The deck machinery comprises a forward hawser winch from Fluid Mechanica with a brake holding load of 100 Tonnes and a line pull of 60 tonnes at 5m/min or 7.5 tonnes at 40 m/min.   The aft deck has a 50 tonne SWL tow hook from Mampaey.  

Main propulsion for comprises a pair of Daihatsu 6DKM-20e diesel engines, each rated 1060 kW at 900 rpm, and each driving a Schottel SRP 1012 Fixed pitch Z-drive unit with 2.0m propellers, in ASD configuration.

The electrical plant comprises 2 identical diesel gensets, each with power output of 200 ekW.  The genset engines are MAN D 2866 LXE coupled to a Leroy Somer LSA 47.2 VS 2 alternators.

An independent FIFI pumpset driven by a Volvo D4-225 diesel auxiliary provides basic firefighting capability including foam capability.

Ship-handling fenders at the bow comprises an upper row of 800mm diameter cylindrical fender and a lower course of W-fender. Sheer fendering consists of steel split pipe overlaid with aircraft tires.  300 mm “W” block type fendering is used at the stern.

On trials, Tarua 120 met or exceeded performance expectations, with the following results:

Bollard Pull, ahead:     34 tonnes
Free running speed, ahead:   12 knots

For information on Ramparts 2800 Class tugs, or any other vessel designs developed by Robert Allan Ltd., please contact design@ral.ca.

 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Bay Shipbuilding Delivers ATB to Moran

Fincantieri Marine Group’s Fincantieri Bay Shipbuilding (FBS) has delivered the Articulated Tug Barge unit (ATB) Barbara Carol Ann Moran and the 110,000-barrel

Conrad Shipyard Christens Woods Hole Ferry

M/V Woods Hole, a 235-foot long passenger ferry built for the Steamship Authority of Woods Hole, Mass., was christened on May 20 at Conrad Aluminum in Amelia, La.

Tech & Design Solutions for Modern Workboats

EPA Tier 4 regulations (for engines of 804 hp and higher) and propulsion advancements have many manufacturers and vessel designers changing course to adapt to new requirements and customer demands.

Workboats

Bay Shipbuilding Delivers ATB to Moran

Fincantieri Marine Group’s Fincantieri Bay Shipbuilding (FBS) has delivered the Articulated Tug Barge unit (ATB) Barbara Carol Ann Moran and the 110,000-barrel

Tech & Design Solutions for Modern Workboats

EPA Tier 4 regulations (for engines of 804 hp and higher) and propulsion advancements have many manufacturers and vessel designers changing course to adapt to new requirements and customer demands.

Seacat Services Secures Burbo Bank Charter Deal

DONG Energy has awarded  offshore energy support vessel operator Seacat Services with the supply contract for all crew transfer services at its 258MW Burbo Bank

Ship Sales

China Shipbuilding Plans Major Restructuring

State-owned China Shipbuilding Industry Corp (CSIC) is undertaking a major restructuring as it grapples with an industry downturn, and it will be the largest restructuring

DSME, Sovcomflot Delay Delivery of First Arctic LNG carrier

South Korea's Daewoo Shipbuilding & Marine Engineering (DSME) and Sovcomflot have agreed to delay a liquefied natural gas carrier being built for the Yamal LNG project in Russia.

DSME Reveals Additional Self-Restructuring Plan

South Korean shipbuilder Daewoo Shipbuilding and Marine Engineering (DSME) has  revealed an additional self-restructuring plan amid the falling shipbuilding orders.

Naval Architecture

Tech & Design Solutions for Modern Workboats

EPA Tier 4 regulations (for engines of 804 hp and higher) and propulsion advancements have many manufacturers and vessel designers changing course to adapt to new requirements and customer demands.

Østensjø Rederi Orders Another Wind Farm Vessel

Rolls-Royce has signed a contract with shipyard Astilleros Gondan in Spain to design and equip a second Service Operation Vessel for ship owner Østensjø Rederi.

Royal Caribbean Orders 3 Ships from STX

Following the delivery of Harmony of the Seas on May 12 in Saint-Nazaire, the American group Royal Caribbean Cruises Ltd. signed an order for three additional vessels,

News

Bay Shipbuilding Delivers ATB to Moran

Fincantieri Marine Group’s Fincantieri Bay Shipbuilding (FBS) has delivered the Articulated Tug Barge unit (ATB) Barbara Carol Ann Moran and the 110,000-barrel

Conrad Shipyard Christens Woods Hole Ferry

M/V Woods Hole, a 235-foot long passenger ferry built for the Steamship Authority of Woods Hole, Mass., was christened on May 20 at Conrad Aluminum in Amelia, La.

Ferry Crew-member Missing off Pembroke Coast

HM Coastguard is coordinating the search for a missing crew-member from a ferry, who it is believed may have gone overboard off the Pembroke coast.   The Coastguard

Vessels

Bay Shipbuilding Delivers ATB to Moran

Fincantieri Marine Group’s Fincantieri Bay Shipbuilding (FBS) has delivered the Articulated Tug Barge unit (ATB) Barbara Carol Ann Moran and the 110,000-barrel

Conrad Shipyard Christens Woods Hole Ferry

M/V Woods Hole, a 235-foot long passenger ferry built for the Steamship Authority of Woods Hole, Mass., was christened on May 20 at Conrad Aluminum in Amelia, La.

TAMRF Extends Research Vessel Charter

Overseas Drilling Ltd., a 100 percent owned subsidiary of Siem Offshore Inc., and Texas A&M Research Foundation (TAMRF) have agreed to extend the charter of the

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1760 sec (6 req/sec)