Statoil Announces Discovery

Thursday, September 22, 2011
The Transocean Leader drilling rig. (Photo courtesy Statoil.com)

Statoil, together with partners Petoro AS, Det norske oljeselskap ASA and Lundin Norway AS, has drilled the Aldous Major North prospect (PL 265) in the North Sea.  Samples taken from well 16/2-9S, drilled by the rig Transocean Leader, have proved a column of oil of up to 8 metres in formations dating from the Upper Jurassic period. Due to the limited reservoir quality, the partnership will consider further exploration drilling on Aldous Major North in order to clarify the structure’s potential.
Well 16/2-9S was drilled some 12 kilometres north of the Aldous Major South oil discovery (16/2-8). Aldous Major North and Aldous Major South are two independent structures in the PL 265 licence and there was higher uncertainty related to well 16/2-9S in the northern part of the licence.
“Statoil has previously communicated that the combined Aldous Major South and Avaldsnes discoveries may constitute an oil structure of between 500 and 1200 million barrels of recoverable oil equivalents, and we stand firm on this estimate,” says Gro G. Haatvedt, Statoil’s senior vice president for exploration on the Norwegian continental shelf. 
Following completion of well 16/2-9S on the Aldous Major North prospect, Transocean Leader will return to Aldous Major South to drill appraisal well 16/2-10.
“An appraisal well on Aldous Major South demonstrates that we have great faith in the area’s potential and that the partnership would like to see speedy clarification of the total resource potential in order to secure the rapid development of this discovery,” says Haatvedt.
Aldous Major North and Aldous Major South are located in production licence 265, where Statoil is operator (40%) along with partners Petoro (30%), Det norske oljeselskap (20%) and Lundin (10%).

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

SAL Heavy Lift Performs Offshore Windfarm Work

MV Lone proves as project platform for Wikinger wind farm   SAL Heavy Lift informs it has completed the second phase of the Wikinger Pile Testing Campaign with DP II Class vessel MV Lone.

JIT Transit Slots Reduced at Panama Canal

The Panama Canal has experienced an unusual increase in the number of vessels awaiting transit during the past few weeks. Several measures have been implemented to reduce the backlog,

Swiber Gains $405.6 mi Contracts

Business momentum is fast picking up at Swiber Holdings Limited despite the downturn in the oil and gas industry as the Group clinches a total of US$405.6 million for a series of contracts,

 
 
Maritime Contracts Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1680 sec (6 req/sec)