ABS Approves GTTNA’s LNG Bunker Barge Design

Posted by Eric Haun
Thursday, March 27, 2014
Image courtesy GTTNA

Houston-based GTT North America (GTTNA), U.S. subsidiary of French engineering and technology company Gaztransport & Technigaz SA (GTT), has received approval in principle (AIP) from ABS for the design of a 2,200 cubic meter liquefied natural gas (LNG) bunker barge. The distinctive design incorporates GTT’s proven membrane Cargo Containment System (CCS), which is utilized in 70% of the global LNG carrier fleet and nearly 90% of LNG carrier projects on order.

Leveraging over five decades of LNG storage and maritime transportation experience, GTT developed the membrane LNG bunker barge to demonstrate the efficient storage of LNG and safe, reliable management of Boil-Off Gas (BOG) in an unmanned push barge application. The barge was designed for use in bunkering operations including ship-to-ship LNG transfers or LNG bulk transport in US inland waterways, harbors, and intra-coastal service. The barge could operate as a mobile refueling resource or be moored temporarily to serve as a refueling station.

“An important step in the wide-range adoption of LNG as a marine fuel is the development of bunkering infrastructure that can adequately meet the various operational needs of vessels,” said ABS Director of US Gas Solutions, Roy Bleiberg. “The use of the LNG bunker barge will be a critical part of infrastructure development and this design, which leverages proven GTT technology, is certainly a concept that LNG stakeholders should consider.”

The CCS selected for the barge was GTT’s proprietary Mark III Flex system, an enhancement of the Mark III system that allows for improved thermal and structural performance of the CCS. The Mark III membrane CCS consists of a cryogenic liner directly supported by the vessel’s inner hull, which allows for maximum volumetric utilization of the available cargo space. This liner is composed of a primary metallic membrane fastened atop a prefabricated insulation panel that includes a complete secondary membrane.

The GTT membrane LNG bunker barge will be capable of loading 2156 m3 (at 98%) or 570,000 gallons within 4.5 hours and towed at maximum speed of 8 knots in an efficient footprint: 64.2 m (212 ft) overall length, 14.8 m (48.5 ft) breadth, 7.2 m (15.7 ft) depth, and 2.6 m (8.5 ft) fully loaded design draft. The dimensions and gross tonnage of approximately 1,440 GT afford the GTT membrane LNG bunker barge greater maneuverability and access throughout inland and intra-coastal waterways.

A distinguishing feature of the GTT membrane LNG bunker barge is the management of natural BOG through small-scale reliquefaction units. The StirLNG-4 cryo-cooler unit from the Netherlands-based Stirling Cryogenics was the basis of the boil off management system design.

This barge design, now approved in principle by ABS, provides a robust solution for boil off gas management, an essential requirement for any atmospheric LNG storage system. The design is a major step forward in bringing the coldest cargo with the highest stored energy value to the US LNG fuel market in a safe manner,” said Allyn Risley, Chairman, GTT North America.

Alameda, Calif.-based Herbert Engineering Corp. (HEC) was commissioned to develop the hull and preliminary machinery design scope and Houston-based CH-IV International to develop the cargo handling system (CHS) design scope.

ABS Consulting also assisted in the development of the GTT membrane LNG bunker barge project.

gtt.fr

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Maritime Surveillance Drone Testing to Begin this Summer

The AR5 Life Ray UAS, developed by TEKEVER, has been selected by the European Space Agency (ESA) and the European Maritime Safety Agency (EMSA) to demonstrate the

Elandra Yachts Expands, Launches Finishing Department

Elandra Yachts has added another layer of craftsmanship to its boat-building operation with the launch of a new in-house paint department at the Gold Coast plant,

SENER, ESI Group to Integrate Solutions

The global company ESI Group, a virtual prototyping and testing software developer, has joined efforts with SENER, a company in marine engineering and the development

Shipbuilding

Crowley to Christen 3rd LNG-ready Product Tanker

Crowley Maritime Corp. announced it will hold a christening ceremony Thursday, May 5 in New Orleans for the newly built Louisiana, the company’s third of four new Jones Act product tankers.

Harley Marine Orders Two Harbor Tugs

Harley Marine Services announced the construction of two new ship handling vessels to be built at Diversified Marine in Portland, Ore. The two tugs are sister class

Jensen Debuts New Tractor Tug Design

Crowley Maritime Corp.’s Seattle-based naval architecture and engineering firm, Jensen Maritime, reports it has designed a new tractor tug for Vessel Chartering

Fuels & Lubes

LUKOIL Marine Lubricants Launches Barge in Singapore

Experiencing continued success and growing demand for the supply of marine lubricants, LUKOIL Marine has launched an additional supply barge named LUKOIL Marine.

WSS Offers ‘One Stop Shop’ Approach to Bunkering

Ship operators who rely on a myriad of companies for their global bunkering needs are wasting time, money and energy, with no guarantee of standardized quality of products and services,

Crowley Acquires Ace Fuels Assets in Anchorage

Anchorage-based Crowley Fuels yesterday completed an asset acquisition of the aviation fuels business of Ace Fuels, LLC, a fixed base operator (FBO) headquartered

LNG

Crowley to Christen 3rd LNG-ready Product Tanker

Crowley Maritime Corp. announced it will hold a christening ceremony Thursday, May 5 in New Orleans for the newly built Louisiana, the company’s third of four new Jones Act product tankers.

India Seeks Stake in Iran LNG Terminal

Indian Petroleum Minister Minister Dharmendra Pradhan says India has expressed interest in setting up an LNG terminal at Chahabar port in Iran to ship back home natural gas from Persian Gulf nation,

MOL's LNG Carrier KUMUL Delivered

Mitsui O.S.K. Lines, Ltd. (MOL; President & CEO: Junichiro Ikeda) announced the delivery of the LNG carrier KUMUL at Hudong-Zhonghua Shipbuilding (Group) Co.

News

Crowley to Christen 3rd LNG-ready Product Tanker

Crowley Maritime Corp. announced it will hold a christening ceremony Thursday, May 5 in New Orleans for the newly built Louisiana, the company’s third of four new Jones Act product tankers.

Venezuelan Crude Sales to US Fell 8% in April

Venezuelan crude sales to the United States declined 8.3 percent in April to 734,700 barrels per day (bpd) compared with the same month of 2015, amid delays at PDVSA's main ports,

Bureau Veritas Acquires TMC Marine

Bureau Veritas has acquired international consultancy TMC Marine Ltd.    TMC has provided pre- and post-casualty advice and support to the marine industry since 1979.

Barges

LUKOIL Marine Lubricants Launches Barge in Singapore

Experiencing continued success and growing demand for the supply of marine lubricants, LUKOIL Marine has launched an additional supply barge named LUKOIL Marine.

OMB - Subchapter M Cleared for Publication

The Office of Management and Budget (OMB) completed its review of the draft final rule entitled Inspection of Towing Vessels, also known as "Subchapter M." The

Liebherr Offshore Crane on “Giant 7”

The Liebherr offshore crane division installed a board offshore crane, type BOS 35000 on the heavy lift barge “Giant 7”. The state of the art offshore crane will

Vessels

Crowley to Christen 3rd LNG-ready Product Tanker

Crowley Maritime Corp. announced it will hold a christening ceremony Thursday, May 5 in New Orleans for the newly built Louisiana, the company’s third of four new Jones Act product tankers.

Harley Marine Orders Two Harbor Tugs

Harley Marine Services announced the construction of two new ship handling vessels to be built at Diversified Marine in Portland, Ore. The two tugs are sister class

Sipu Muin Modernization Work to Begin in May

Canadian Coast Guard plans upgrades for Air Cushion Vehicle   A scheduled modernization of the Canadian Coast Guard CCGS Sipu Muin will see the Air Cushion Vehicle

 
 
Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1281 sec (8 req/sec)