ABS Approves GTTNA’s LNG Bunker Barge Design

Posted by Eric Haun
Thursday, March 27, 2014
Image courtesy GTTNA

Houston-based GTT North America (GTTNA), U.S. subsidiary of French engineering and technology company Gaztransport & Technigaz SA (GTT), has received approval in principle (AIP) from ABS for the design of a 2,200 cubic meter liquefied natural gas (LNG) bunker barge. The distinctive design incorporates GTT’s proven membrane Cargo Containment System (CCS), which is utilized in 70% of the global LNG carrier fleet and nearly 90% of LNG carrier projects on order.

Leveraging over five decades of LNG storage and maritime transportation experience, GTT developed the membrane LNG bunker barge to demonstrate the efficient storage of LNG and safe, reliable management of Boil-Off Gas (BOG) in an unmanned push barge application. The barge was designed for use in bunkering operations including ship-to-ship LNG transfers or LNG bulk transport in US inland waterways, harbors, and intra-coastal service. The barge could operate as a mobile refueling resource or be moored temporarily to serve as a refueling station.

“An important step in the wide-range adoption of LNG as a marine fuel is the development of bunkering infrastructure that can adequately meet the various operational needs of vessels,” said ABS Director of US Gas Solutions, Roy Bleiberg. “The use of the LNG bunker barge will be a critical part of infrastructure development and this design, which leverages proven GTT technology, is certainly a concept that LNG stakeholders should consider.”

The CCS selected for the barge was GTT’s proprietary Mark III Flex system, an enhancement of the Mark III system that allows for improved thermal and structural performance of the CCS. The Mark III membrane CCS consists of a cryogenic liner directly supported by the vessel’s inner hull, which allows for maximum volumetric utilization of the available cargo space. This liner is composed of a primary metallic membrane fastened atop a prefabricated insulation panel that includes a complete secondary membrane.

The GTT membrane LNG bunker barge will be capable of loading 2156 m3 (at 98%) or 570,000 gallons within 4.5 hours and towed at maximum speed of 8 knots in an efficient footprint: 64.2 m (212 ft) overall length, 14.8 m (48.5 ft) breadth, 7.2 m (15.7 ft) depth, and 2.6 m (8.5 ft) fully loaded design draft. The dimensions and gross tonnage of approximately 1,440 GT afford the GTT membrane LNG bunker barge greater maneuverability and access throughout inland and intra-coastal waterways.

A distinguishing feature of the GTT membrane LNG bunker barge is the management of natural BOG through small-scale reliquefaction units. The StirLNG-4 cryo-cooler unit from the Netherlands-based Stirling Cryogenics was the basis of the boil off management system design.

This barge design, now approved in principle by ABS, provides a robust solution for boil off gas management, an essential requirement for any atmospheric LNG storage system. The design is a major step forward in bringing the coldest cargo with the highest stored energy value to the US LNG fuel market in a safe manner,” said Allyn Risley, Chairman, GTT North America.

Alameda, Calif.-based Herbert Engineering Corp. (HEC) was commissioned to develop the hull and preliminary machinery design scope and Houston-based CH-IV International to develop the cargo handling system (CHS) design scope.

ABS Consulting also assisted in the development of the GTT membrane LNG bunker barge project.

gtt.fr

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Construction Starts on Crowley’s 2nd LNG ConRo Ship

Construction begins on Crowley’s second Commitment Class, LNG-powered ConRo ship for use in the Puerto Rico trade   Shipbuilder VT Halter Marine, Inc. has officially

UKHO ‘Living with ECDIS’ Seminars at Nor-Shipping

Seminar to include information on updated IHO ENC Standards   The United Kingdom Hydrographic Office (UKHO) has announced the details of its free-to-attend ECDIS Seminars at Nor-Shipping,

New Launches, Demonstrations Set for Seawork

Europe’s commercial marine and workboat exhibition held in a working port, Seawork International, has released its plans for demonstrations, launches and conferences.

Shipbuilding

Bahri Orders VLCC Newbuilds

Bahri ordered five newbuild very large crude carriers from Hyundai Samho Heavy Industries   The National Shipping Company of Saudi Arabia (Bahri) today signed

Construction Starts on Crowley’s 2nd LNG ConRo Ship

Construction begins on Crowley’s second Commitment Class, LNG-powered ConRo ship for use in the Puerto Rico trade   Shipbuilder VT Halter Marine, Inc. has officially

Scandlines Orders Ferry Battery System

Corvus Energy announces the signing of marine Energy Storage System (ESS) contract with Scandlines Denmark ApS; world’s largest battery hybrid electric fleet orders additional 2.

Fuels & Lubes

Shell Offers Smooth Transition to ECAs

Shipowners switching to low sulphur content fuels in line with their obligations in Emissions Control Areas (ECAs) have demanded confidence in the cylinder oils

New MD for Glander Int'l Bunkering (India)

Glander International Bunkering is proud to announce that Ajay Menon has been appointed as the Managing Director of Glander International Bunkering (India) Private Limited.

CAT’s New Dual Fuel Engine M 4G DF

At the beginning of 2015 the exhaust limit values for sulfur oxides (SOx) grew ever tighter in emission controlled areas. And with the start of 2016, nitrogen oxides

LNG

Construction Starts on Crowley’s 2nd LNG ConRo Ship

Construction begins on Crowley’s second Commitment Class, LNG-powered ConRo ship for use in the Puerto Rico trade   Shipbuilder VT Halter Marine, Inc. has officially

Hoegh LNG Bags FSRU Deal in Chile

Oslo-based Höegh LNG said it has signed an Floating Storage and Regasification Unit (FSRU)contract with Chilean Octopus LNG for the Penco-Lirquén LNG import terminal to be located in Concepción Bay,

CNPC Eyes Myanmar for LNG Terminal

China's biggest oil and gas company China National Petroleum Corp.(CNPC ) has expressed interested in  a terminal in Kyaukphyu in Myanmar  to receive imported Liquefied natural gas (LNG).

Naval Architecture

Natural Gas Articulated Conduit System Patented

Elliott Bay Design Group (EBDG) announced that long-time partner Moran Towing Corporation has been granted US Patent 8,967,174 for "Articulated conduit systems

Apply Now for the MN 100

The August 2015 edition of Marine News, the leading voice in the North American workboat market, will feature 100 leaders and innovators, including workboat owners and operators,

Numerical Towing Tanks A Practical Reality?

Since the first commercial ship basin was commissioned in 1883, towing tanks have provided naval architects with a reliable method of predicting the performance of a ship at sea.

News

CMA-CGM to Call Port of Baltimore

International container shipping company CMA-CGM of France announced that it will begin service within the next couple of weeks to the Helen Delich Bentley Port of Baltimore.

Somaliland to Pick Berbera Port Partner by End of Year

Somaliland expects to choose a partner to develop and manage its Berbera port by the end of the year, with construction expected to start early next year, the breakaway

Hapag-Lloyd Expands Feeder Network in Scandinavia

Baltic Express Service (BAX) to include Oslo / Two weekly departures from Gothenburg and Helsingborg in SDX and GTE / Connection via Hamburg and Bremerhaven to

Barges

Natural Gas Articulated Conduit System Patented

Elliott Bay Design Group (EBDG) announced that long-time partner Moran Towing Corporation has been granted US Patent 8,967,174 for "Articulated conduit systems

Apply Now for the MN 100

The August 2015 edition of Marine News, the leading voice in the North American workboat market, will feature 100 leaders and innovators, including workboat owners and operators,

Snarled in Traffic, Intermodal Answers Include the Water

It was just last month that the (challenged) Keefe family packed up the SUV and set out for a little bit of spring break fun, mixed in with a college visit for my son,

Vessels

Bahri Orders VLCC Newbuilds

Bahri ordered five newbuild very large crude carriers from Hyundai Samho Heavy Industries   The National Shipping Company of Saudi Arabia (Bahri) today signed

Construction Starts on Crowley’s 2nd LNG ConRo Ship

Construction begins on Crowley’s second Commitment Class, LNG-powered ConRo ship for use in the Puerto Rico trade   Shipbuilder VT Halter Marine, Inc. has officially

Star Clippers to Build Massive Square Rigger

Tall ship sailing specialist Star Clippers has announced that it has started building a fourth ship to add to its fleet of graceful square-riggers; its first new-build

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1429 sec (7 req/sec)