ABS Approves GTTNA’s LNG Bunker Barge Design

Posted by Eric Haun
Thursday, March 27, 2014
Image courtesy GTTNA

Houston-based GTT North America (GTTNA), U.S. subsidiary of French engineering and technology company Gaztransport & Technigaz SA (GTT), has received approval in principle (AIP) from ABS for the design of a 2,200 cubic meter liquefied natural gas (LNG) bunker barge. The distinctive design incorporates GTT’s proven membrane Cargo Containment System (CCS), which is utilized in 70% of the global LNG carrier fleet and nearly 90% of LNG carrier projects on order.

Leveraging over five decades of LNG storage and maritime transportation experience, GTT developed the membrane LNG bunker barge to demonstrate the efficient storage of LNG and safe, reliable management of Boil-Off Gas (BOG) in an unmanned push barge application. The barge was designed for use in bunkering operations including ship-to-ship LNG transfers or LNG bulk transport in US inland waterways, harbors, and intra-coastal service. The barge could operate as a mobile refueling resource or be moored temporarily to serve as a refueling station.

“An important step in the wide-range adoption of LNG as a marine fuel is the development of bunkering infrastructure that can adequately meet the various operational needs of vessels,” said ABS Director of US Gas Solutions, Roy Bleiberg. “The use of the LNG bunker barge will be a critical part of infrastructure development and this design, which leverages proven GTT technology, is certainly a concept that LNG stakeholders should consider.”

The CCS selected for the barge was GTT’s proprietary Mark III Flex system, an enhancement of the Mark III system that allows for improved thermal and structural performance of the CCS. The Mark III membrane CCS consists of a cryogenic liner directly supported by the vessel’s inner hull, which allows for maximum volumetric utilization of the available cargo space. This liner is composed of a primary metallic membrane fastened atop a prefabricated insulation panel that includes a complete secondary membrane.

The GTT membrane LNG bunker barge will be capable of loading 2156 m3 (at 98%) or 570,000 gallons within 4.5 hours and towed at maximum speed of 8 knots in an efficient footprint: 64.2 m (212 ft) overall length, 14.8 m (48.5 ft) breadth, 7.2 m (15.7 ft) depth, and 2.6 m (8.5 ft) fully loaded design draft. The dimensions and gross tonnage of approximately 1,440 GT afford the GTT membrane LNG bunker barge greater maneuverability and access throughout inland and intra-coastal waterways.

A distinguishing feature of the GTT membrane LNG bunker barge is the management of natural BOG through small-scale reliquefaction units. The StirLNG-4 cryo-cooler unit from the Netherlands-based Stirling Cryogenics was the basis of the boil off management system design.

This barge design, now approved in principle by ABS, provides a robust solution for boil off gas management, an essential requirement for any atmospheric LNG storage system. The design is a major step forward in bringing the coldest cargo with the highest stored energy value to the US LNG fuel market in a safe manner,” said Allyn Risley, Chairman, GTT North America.

Alameda, Calif.-based Herbert Engineering Corp. (HEC) was commissioned to develop the hull and preliminary machinery design scope and Houston-based CH-IV International to develop the cargo handling system (CHS) design scope.

ABS Consulting also assisted in the development of the GTT membrane LNG bunker barge project.

gtt.fr

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Novoship to Install Ecochlor BWTS on 4 Tankers

SCF Novoship Technical Management has selected the Ecochlor Ballast Water Treatment System (BWTS) to be retrofitted on three Aframax Oil Tankers and one Product Carrier.

DCNS Deploys 3DEXPERIENCE Solution

Dassault Systèmes and DCNS partner on the 3DEXPERIENCE innovation platform for next generation naval defense solutions   Multi-disciplinary, Collaborative Innovation

Hapag-Lloyd Sees Uptick of Incorrectly Declared Dangerous Goods

Year-on-year increase of 65 percent; more than 4,300 cases worldwide   Container shipper Hapag-Lloyd said it registered considerably more incorrectly declared dangerous goods last year,

LNG

LNG Bulker Cements Thordon's Green Future

Sea trials aboard Greenland, the world’s first LNG-fuelled short-sea dry bulk vessel, have validated the performance of Thordon Bearings COMPAC propeller shaft solution,

Norway will be Lithuania's 2016 Top Gas Supplier

Lithuania will import more gas from Norway than from former sole supplier Russia in 2016 after developing infrastructure to support liquefied natural gas (LNG) imports,

Total Signs Deal to Supply LNG to China's ENN

Total SA has signed an agreement to supply liquefied natural gas to ENN Energy in China, according to a news release on the French energy company's website.   The deal is for 0.

News

Novoship to Install Ecochlor BWTS on 4 Tankers

SCF Novoship Technical Management has selected the Ecochlor Ballast Water Treatment System (BWTS) to be retrofitted on three Aframax Oil Tankers and one Product Carrier.

Edison Chouest Opening Mississippi Shipyard

Edison Chouest Offshore locating shipbuilding operations, TopShip, LLC, in Gulfport, Miss.   Gov. Phil Bryant and officials from Edison Chouest Offshore, an offshore

R&M Group Merges with Sea Level Marine

R&M Ship Technologies USA, Inc. has merged Sea Level Marine, LLC. in efforts to increase the range of services offered to the company’s global client base. By aligning resources,

Barges

Aqualis Offshore Lands Study Job for LNG Barge

Offshore marine and engineering consultancy Aqualis Offshore, part of Oslo-listed Aqualis ASA, has been contracted by Gas Entec Co. Ltd to provide an engineering

Barge Breakaway on the Mississippi

The U.S. Coast Guard is responding to a report of a grounded towing vessel and 35 barge breakaway near Caruthersville, Mo. On the Mississippi River.   Coast Guard

More than 100 Graduate from SUNY Maritime

More than 100 students crossed the stage to receive their degrees at State University of New York Maritime College Jan. 29.   Graduates represent 15 fields of study,

Vessels

Novoship to Install Ecochlor BWTS on 4 Tankers

SCF Novoship Technical Management has selected the Ecochlor Ballast Water Treatment System (BWTS) to be retrofitted on three Aframax Oil Tankers and one Product Carrier.

Insights: Benny Cenac, Jr., Owner & CEO, Cenac Towing Company

Arlen “Benny” Cenac Jr. is a third-generation owner of Cenac Towing Company. The firm, originally founded in 1927 by his grandfather, now does business as Cenac Marine Services.

Seaspan Venture: Like for Like

“We don’t usually remove the heads at mid-life on the Cummins engines,” Randy Beckler, Shore Engineer for Seaspan Marine, explained in reference to the 2003 launched

Classification Societies

IMO Revises Guidelines for AIS Use

The International Maritime Organization (IMO) has published revised guidelines for onboard operational use of shipborne automatic identification systems (AIS), as Resolution A.

New Offshore Vessel to be Fitted with Cathelco BWTS

Cathelco is supplying a ballast water treatment (BWT) system for a new offshore vessel built by Eastern Shipbuilding Group Inc., for Harvey Gulf International Marine, LLC.

Crowley Christens 2nd LNG-ready Product Tanker

Crowley christens second of four newly built, LNG-ready product tankers for use in U.S. coastwise trade   Crowley Maritime Corp. has christened the second of

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1260 sec (8 req/sec)