Turkey Approves EIA Report for South Stream’s Offshore Section

By Joseph R. Fonseca
Thursday, July 24, 2014
South Stream’s offshore pipeline


The Ministry of Environment and Urban Planning of Turkey approved the Environmental Impact Assessment (EIA) Report and issued a positive opinion of the EIA results for South Stream's offshore section in Turkey.

The Report contains the assessment of potential environmental impacts caused by the gas pipeline construction, including the impact on the seabed geology, water quality and marine ecology. The document concludes that the project will have no considerable effect on the Black Sea environment or the regional fishing industry. In addition, the Report proposes a number of measures aimed at eliminating or mitigating any environmental impacts of the project. For example, the gas pipeline bypasses certain locations of shipwrecks. Such measures are already incorporated in the design documents for the gas pipeline construction.

South Stream's offshore section will run at a distance of over 110 kilometers offshore Turkey at a depth reaching 2,200 meters. The first string of the offshore gas pipeline in Russia's territorial waters will be laid starting from late 2014. The first pipelaying vessel will enter the Turkish exclusive economic zone in the first quarter of 2015. The first offshore pipeline will be commissioned by late 2015.

South Stream is Gazprom's global infrastructure project aimed at constructing a gas pipeline with a capacity of 63 billion cubic meters across the Black Sea to Southern and Central Europe for the purpose of diversifying the natural gas export routes and eliminating transit risks. At present the gas pipeline construction is underway in Russia, Bulgaria and Serbia. First gas via South Stream will be supplied to European consumers in late 2015. The gas pipeline will reach its full capacity in 2018.

The pipeline's offshore section will comprise four strings, over 930 kilometer long each, laid under the Black Sea within a single routing at the depth of more than 2,200 meters. South Stream's offshore section is constructed by South Stream Transport, a joint project company with Gazprom holding a 50 per cent share, Italian Eni – 20 per cent, German Wintershall and French EDF – 15 per cent each.
 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

IMO Adopts Polar Code Environmental Provisions

United Nations' International Maritime Organization (IMO) has adopted the environmental part of the Polar Code. Hereby, internationally binding regulations on

Two Hurt in Petrobras Platform Accident; Output Halted

Brazil's state-led oil company Petrobras was forced to stop output at its P-56 offshore oil production ship on Wednesday in the Marlim Sul field after an explosion

Energy

US Funding for Air Emissions/Alternative Energy Projects

The U.S. Maritime Administration (MARAD) announced that up to $1.3 million in Federal funding is now available through cooperative agreements for projects supporting

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

SoCal Beach Cleanup Could Take Months

The U.S. Coast Guard captain overseeing cleanup of oil spilled from a pipeline rupture that closed two California state beaches and fouled offshore waters near

News

DMW Marine Takes the Lead in Military Cranes

DMW Marine Group, LLC. has completed a number of projects for the U.S. Navy and foreign Navies in recent years, claiming a place as a go-to supplier for Navy departments globally.

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

USCG Tall Ship Sailing to the Bahamas

The U.S. Coast Guard Cutter Eagle is scheduled to arrive at Berth 14 at Prince George Wharf in Nassau, Bahamas on Thursday, May 28 as part of its 2015 cadet summer training deployment.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Offshore Oil Pod Propulsion Port Authority Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4748 sec (2 req/sec)