$100.4 Million for LPD 22

Thursday, May 27, 2004
Northrop Grumman Corporation was awarded $100.4 million by the U.S. Navy for advance procurement of long-lead time materials for San Diego (LPD 22), the sixth amphibious transport dock ship in the transformational San Antonio class LPD 17 program.

Long-lead materials for LPD 22 consist of steel plates and shapes, pipe, cable and other major equipment. Advance procurement funding is necessary to secure all necessary ship equipment at the best possible purchase price prior to construction.

To date, the first five ships awarded in the 12-ship LPD 17 program are under contract to Northrop Grumman Ship Systems. All are in various stages of construction at Northrop Grumman Ship Systems' locations in New Orleans, and Pascagoula and Gulfport, Miss.

The first ship, San Antonio (LPD 17), is in New Orleans and scheduled for sea trials and delivery later this year. New Orleans (LPD 18), also under construction in New Orleans, is approximately 50 percent complete, and Mesa Verde (LPD 19), under construction in Pascagoula, is approximately 45 percent complete. LPD 18 and 19 are scheduled for launching and christening this fall. Green Bay (LPD 20) is approximately 15 percent complete, and start of construction began on New York (LPD 21) earlier this year. New York had 24 tons of steel from the south tower of the World Trade Center cast into its bowstem, the leading edge of the ship. Both New York and Green Bay are under construction in New Orleans.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

WWII Wrecks Found off North Carolina

German U-boat 576 and freighter Bluefields found within 240 yards A team of researchers led by NOAA’s Office of National Marine Sanctuaries have discovered two

US & ROK Navies to Participate in Exercise Clear Horizon

The U.S. and Republic of Korea (ROK) navies will participate in Exercise Clear Horizon, October 20-24, in waters south of the Korean peninsula. Clear Horizon

Mount Whitney Departs Batumi, Georgia

The U.S. 6th Fleet command and control ship USS Mount Whitney (LCC 20) departed Batumi, Georgia, Oct. 18 after completing a successful port visit. While in Batumi,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1013 sec (10 req/sec)