$140m Order for Rolls-Royce Offshore

Thursday, December 20, 2007
Rolls-Royce has won $140m of business on its largest ever offshore marine contract, taking the total order value to $310m. In June 2007, the company announced an $166m million contract to deliver designs and equipment for six new Rolls-Royce offshore service vessels to Nordcapital, which will be operated on their behalf by OSM Schiffahrt. The new order win covers a further four ships. The vessels - designed by Rolls-Royce and incorporating a range of its marine equipment, including diesel engines, deck machinery, thrusters and dynamic positioning systems will be built by the Korean yard Sekwang. The four UT 786 CD deep water anchor handling vessels are Rolls-Royce UT-Design ships which have been highly successful in the commercial shipbuilding market, with over 500 vessels built since the mid 1970s and around 100 currently on order.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

New Crewboat Design for Offshore O&G Market

Upgraded crewboat design employs carbon-reinforced composite materials and is lighter, faster and more fuel-efficient than alternatives. Marine Oil Transportation

2,545 Candidates Vie for 11 Positions at Maersk Drilling

Maersk Drilling reported 2,545 applicants for the 11 MITAS engineer positions available within the company in 2014. The Maersk International Technology and Science Program,

GDI Awards N-KOM US$110-M Contracts

Gulf Drilling International (GDI) Limited, a subsidiary of Gulf International Services (GIS), the largest oilfield service company in Qatar, has awarded two contracts

Environmental

Nation’s Vessel Operators Join EPA as SmartWay Affiliate

The American Waterways Operators, a 350-member trade association representing the U.S. tugboat, towboat and barge industry, announced today that it joined the SmartWay Transport Partnership,

ABS, MPA to Collaborate on Maritime R&D

ABS and the Maritime and Port Authority of Singapore (MPA) signed a memorandum of understanding (MOU) today to promote maritime research and development (R&D) and innovation.

Concordia Tow Update: Smooth Sailing

The Costa Concordia wreck removal team reported this morning at 10:30 a.m. that after 22 hours of navigation, the convoy was over 50 miles off Giglio Island with about 140 miles from Genoa Prà-Voltri.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1722 sec (6 req/sec)