$630m Drill Ship is Korea's Most Expensive Ship

Friday, December 29, 2006
The most expensive ship among the orders Korean shipbuilders have won this year is a $630m drill ship. Samsung Heavy Industries won a contract from Sweden in October to build the 97,000-ton drill ship, which is 228 m long and 19 m tall. In terms of price, the ship costs the equivalent of five 300,000-ton crude oil carriers (VLCCs) or two or three LNG ships.

The next most expensive orders were also for drill ships, worth $550-590 million in second to fifth, which were won by Samsung Heavy Industries from European countries including Norway. Excluding drill ships, a $284 million LNG ship is the most expensive order, won by Samsung Heavy Industries from Qatar in March. The next are a $283 million LNG vessel and a $280 million LNG-RV or regasification vessel which were won by Daewoo Shipbuilding and Marine Engineering from Qatar and Samsung Heavy Industries from Norway. Source: Digital Chosun

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Watson Named VP of Meridian Global Consulting

William H. Watson has been appointed as Vice President of Meridian Global Consulting, LLC, a Mobile, Alabama-based scalable risk mitigation specialist consultancy.

Evergreen Line Makes Maiden Call to Boston

Evergreen Line’s ItalLunare celebrated its maiden call to the Port of Boston with an official first call and plaque presentation on Wednesday, the Massachusetts Port Authority (Massport) announced.

Eaton to Exhibit at SMM

Power management company Eaton will demonstrate its expanded ability to deliver electrical, explosion-proof and hydraulic equipment for the marine and offshore

Shipbuilding

Ecuador Coastguard Orders Damen Patrol Boats

Damen announced it has recently signed a contract with AstillerosNavalesEcuatorianos (Astinave) to construct two Damen Stan Patrols (Spa) 5009 for the Ecuadorian Coastguard.

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

MN 100: Brunswick Commercial and Government Products

420 Megan Z. Ave Edgewater, FL 32132 Telephone: 386 423 2934 E-mail: kelsey.nemeth@whaler.com Website: www.brunswickcgp.com CEO/President: Huw Bower Number

 
 
Maritime Standards Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1758 sec (6 req/sec)