Status Update: Northeast Gateway

Monday, October 24, 2005
On October 18, 2005, a public scoping meeting was held in Boston, Massachusetts to discuss the proposed Northeast Gateway Deepwater Port project. The purpose of the meeting was to accept the public’s comments regarding the proposed project. The meeting took place from 6 p.m. to 8 p.m. in Faneuil Hall and was preceded by an informational open house from 4:30 p.m. to 6 p.m. A similar public scoping meeting and open house for the Northeast Gateway project took place in Gloucester, Massachusetts on October 19, 2005.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

Ice Hurts March’s Lakes Ore Shipments

Massive, thick ice formations on the Great Lakes limited iron ore shipments in March to 1.1 million tons, a decrease of 43 percent compared to a year ago, the Lake

Miami Tugboat Oil Spill: Coast Guard Respond

The US Coast Guard says that its crewmembers are responding to a fuel spill in the vicinity of Government Cut in Miami, following a leak discovered aboard the 95-foot tugboat 'Neptune'.

Shipowners to Become Liable for Costs of Wreck Removal

Shipowner liability is on the horizon as the Nairobi International Convention on the Removal Wrecks will enter into force on 14 April 2015 following the deposit,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3138 sec (3 req/sec)