Status Update: Northeast Gateway

Monday, October 24, 2005
On October 18, 2005, a public scoping meeting was held in Boston, Massachusetts to discuss the proposed Northeast Gateway Deepwater Port project. The purpose of the meeting was to accept the public’s comments regarding the proposed project. The meeting took place from 6 p.m. to 8 p.m. in Faneuil Hall and was preceded by an informational open house from 4:30 p.m. to 6 p.m. A similar public scoping meeting and open house for the Northeast Gateway project took place in Gloucester, Massachusetts on October 19, 2005.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

‘Green’ Hybrid-powered Research Vessel Christened

The Maritime Aquarium at Norwalk christened a larger, “greener” new research vessel on Friday, September 26 in preparation for launching a new era in examining,

Cove Point LNG Export Facility Gets US FERC Approval

U.S. federal regulators on Monday approved construction of Dominion Resources Inc's liquefied natural gas export project in Cove Point, Maryland. Cove Point is the fourth U.

Shipping's GHG Emissions Down

The total Green House Gas (GHG) emissions from global maritime transport are estimated to have been over 20% lower in 2012 than in 2007, according to "London Matters

 
 
Maritime Contracts Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1138 sec (9 req/sec)