Coast Guard Prepares EIS on LNG Project

Wednesday, October 05, 2005
The U.S. Coast Guard is preparing an environmental impact statement (EIS) regarding the proposed Northeast Gateway Energy Bridge LNG deepwater port (DWP) project. Public meetings will be held in Boston (October 18) and Gloucester (October 19). Written comments should be submitted by October 31. 70 Fed. Reg. 58228 Source: HK Law
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Petrobras, Mitsui Study South Brazil LNG Import Terminal

Brazil's state-run oil company Petroleo Brasileiro SA and Japanese trading house Mitsui Corp will study building a liquefied natural gas (LNG) terminal in the country's southernmost state,

Ukraine launches restricted operation

Ukrainian forces launched a "special operation" on Tuesday against separatist militia in the Russian-speaking East, authorities said, although aside from a landing

OSC Plans Fleet Expansion through 2018

State-owned Oman Shipping Company SAOC (OSC) is projecting to expand its current fleet of 43 ships to 50 by 2018, the Oman Daily Observer reported. According to the report,

 
 
Maritime Contracts Maritime Standards Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2269 sec (4 req/sec)