PetroCom’s VSAT Sat Services Completely Operational

Tuesday, September 27, 2005
PetroCom is making great strides in repairing its communication systems that were damaged by Hurricane Katrina. Patched very small aperture terminal (VSAT) satellite and wireless systems that were quickly operational with ingenuity and resourcefulness are now repaired properly and working near capacity. “My staff has done an unbelievable job of improvising and thinking outside of the box to restore services. Our first goal was to patch communication trunk-lines and make them operational, which allowed us to evaluate the full extent of the damages,” said PetroCom President & COO Ken Wright. “We have restored our satellite backbones to full capacity and are now working closely with platform owners to repair dedicated equipment and speed the recovery of the Gulf’s oil and gas industry.” PetroCom’s DS3 fiber-optic connection has been repaired in New Orleans and VSAT satellite services are fully operational and capable of running at full capacity. PetroCom has deployed portable VSAT systems to replace damaged, dedicated equipment in the Gulf of Mexico. Portable VSAT systems are available for immediate installation. Repairs on the wireless switch that handles GSM and analog wireless communication are complete, and terrestrial communication interconnects have been re-established. Terrestrial connectivity has been greatly restored to land-based switched networks. The cellular network is capable of carrying 75 percent of the volume it handled before Hurricane Katrina and 36 of 43 Gulf cell sites are functioning. PetroCom is working with platform owners to continue service restoration. A list of functional towers can be found at www.petrocom.com/StormTrack/public/. PetroCom’s roaming capabilities with Cingular Wireless have been restored, and its wireless switches are processing analog and GSM cellular traffic from many of their towers in the Gulf. Several small voice/data/fax wireless communication packages are available for short-term use.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navigation

GAO: Limited Commercial Arctic Development Foreseen

Decreasing seasonal sea ice has opened up Arctic waters for longer periods with resulting potential economic opportunities in commercial shipping, cruises, commercial fishing, oil, and mining.

Reminder Stresses Importance of Accurate Clearance Information

The Captain of the Port, New York-New Jersey, has issued a reminder about the importance of providing accurate clearance information, and warns that civil penalties

NOAA Begins Hydrographic Survey Season

New data will update nautical charts around the country. As sure as spring arrives, NOAA vessels and independent contractors are hitting the seas for the nation's

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1369 sec (7 req/sec)