George G. Sharp Wins Contract

Friday, September 09, 2005
George G. Sharp Inc., Virginia Beach, Va., is being awarded a $12,170,065 cost-plus-fixed-fee contract for operation and maintenance of the NAVSEA Inactive Ships On-Site Maintenance Office (NISMO) in Philadelphia Pa. This contract includes a one-year base period and four one-year options, which if exercised, bring the total estimated contract value to $52,277,547. Work will be performed in Philadelphia, Pa. (85 percent); Norfolk, Va. (7.5 percent); and Newport, R. I (7.5 percent), and work is expected to be completed by September 2006. This contract was competitively procured, with eight offers received. The Fleet and Industrial Supply Center Norfolk Philadelphia Division is the contracting activity (N00140-06-C-0003).
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

US Navy Orders Demonstration Craft from Willard Marine

Willard Marine, Inc. (WMI) announced it has been selected through a solicitation process to supply a demonstration model of a new, advanced combatant craft for the U.

Alu Design to Create Next Generation of Marine Chairs

There’s a new designer in the driving seat at Alu Design. Per Ivar Selvaag, the former Lead Designer at BMW Group and Chief Designer of Peugeot’s concept car division,

Cruise Ship Trends

Holland America Line & Seabourn names Kammerer is V.P

Mark Kammerer has been named vice president, international marketing and sales for Holland America Line and Seabourn. In this role, he will be responsible for the companies’ sales offices in the U.

Cruise Ship Returns to Texas after Ebola Concern

The Carnival Magic cruise ship was en route back to the United States on Saturday with a passenger from Texas who might have handled specimens of the first Ebola

Kiel's 2014 Cruise Shipping Season Ends

Expanded terminal capacities created at Berth 1 This year’s cruise shipping season in Kiel closes on the evening of October 18 when the AIDAcara sets sail for the Canary Islands.

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0814 sec (12 req/sec)