A&P Southhampton to Repair Sundream

Wednesday, October 23, 2002
A&P Group has won the contract to carry out repairs to the 22,945grt Cruise Liner Sundream at its Southampton dry dock facility. The ship, which is operated by Sun Cruises (part of the MyTravel Group), will arrive at A&P Southampton on 26th October for a scheduled 21 day dry dock and refit period. Work will include extensive tank repairs, blasting and painting of the hull and davits, shell door inspections, various steel and pipe work renewals, port tail shaft and stabiliser surveys as well as general machinery overhauls. The Sundream, which trades in the Mediterranean, Northern Europe and the Caribbean, is the first Sun Cruises liner to dry dock with the A&P Group.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Jensen Debuts New Tractor Tug Design

Crowley Maritime Corp.’s Seattle-based naval architecture and engineering firm, Jensen Maritime, reports it has designed a new tractor tug for Vessel Chartering

Elandra Yachts Expands, Launches Finishing Department

Elandra Yachts has added another layer of craftsmanship to its boat-building operation with the launch of a new in-house paint department at the Gold Coast plant,

Smulders Appointed CEO of Radio Holland

Paul Smulders has been appointed CEO of Radio Holland, part of the RH Marine Group (formerly Imtech Marine).   Smulders returns to Radio Holland where he started

Ship Repair & Conversion

Sipu Muin Modernization Work to Begin in May

Canadian Coast Guard plans upgrades for Air Cushion Vehicle   A scheduled modernization of the Canadian Coast Guard CCGS Sipu Muin will see the Air Cushion Vehicle

Raytheon Anschütz Steering Gear Control for Luxury Cruise Ships

The German navigation system manufacturer Raytheon Anschütz was awarded a retrofit contract of steering gear control systems for two luxury cruise ships chartered by Noble Caledonia Ltd.

Ferry Drydocking Completed on 2-day Turnaround

Great Lakes Shipyard hauled out the Kelleys Island Ferry Kayla Marie on April 18 for its USCG five-year inspection survey. The yard completed all work, and refloated the vessel two days later,

 
 
Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0959 sec (10 req/sec)