Aker MTW Acquires Order for Three Containerships

Wednesday, June 11, 2003
Aker MTW Werft (AMTW) in Wismar, Germany has acquired three orders to build container vessels, a joint development with Kvaerner Warnow Werft in Rostock-Warnemünde (Germany). The contract, worth $115M, is for three vessels that were ordered by Reederei Hartmann in Leer (Lower Saxony). The vessels which will be built in Wismar and Rostock-Warnemünde are due for delivery in the third and fourth quarters 2004. The contracts are subject to the settlement of financial issues by mid July 2003. The vessels of the type BALTIC CS 2500 are 207.4 m long and 29.8 m wide, with a deadweight of 33,900 t. They have a total container stowage capacity of 2,478 TEU with 400 reefer sockets for FEU. With a main engine output of about 21,500 KW the vessels have a service speed of 22 kn.
Maritime Reporter November 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

U.S. Drillers Cut Rigs to Lowest since August

Energy companies have reduced the number of rigs drilling for oil in the United States to the lowest since August, shifting more rigs in favor of natural gas as crude prices dive,

Equinox Class Scrubber Systems Receive Certification

Algoma Central Corporation (“Algoma”), the largest Canadian shipowner and operator of domestic Great Lakes vessels announces that it has received all requisite

MARAD Tests Alternative Power for Ships

The Maritime Administration (MARAD) is testing state-of-the-art, environmentally efficient technology onboard the Training Ship (TS) Kennedy.   The National Defense

Container Ships

Asia-Euro Box Rates Jump 88 pct

Shipping freight rates for transporting containers from ports in Asia to Northern Europe jumped 88.2 percent to $1,312 per 20-foot container (TEU) in the week ended on Friday,

Seaspan Receives 5th 10K TEU Boxship

Seaspan Corporation announced yesterday that it accepted delivery of a 10000 TEU containership, the MOL Brightness.   The new containership, which was constructed

CMA CGM to Retrofit 10 More Bulbous Bows

The CMA CGM Group said it will retrofit 10 of its vessels’ bulbous bows to achieve improved energy efficiency for slow steaming. The modifications are in addition

 
 
Maritime Security Naval Architecture Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2154 sec (5 req/sec)