Harvey to Construct Third Vessel

Tuesday, March 21, 2000
Harvey Gulf International has signed an agreement with a Louisiana shipyard to build a third vessel, which will measure 135 x 40 x 21 ft., and will be powered by two EMD Turbos with Kort nozzles. The vessel will be a sistership to the company's M/V Harvey Titan, which was delivered in February 1998. The company, which has intentions to construct two more vessels still in the design stage, signed an additional contract during January for the construction of two 150 x 47 x 21 ft.vessels.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Wärtsilä's' BWMS for New Crane Ship Design

A new crane ship designed by Netherlands based Royal IHC, a global leader in offshore, dredging and mining vessels, will feature the Wärtsilä Aquarius UV Ballast Water Management System (BWMS).

Wood Group Extends North Sea Chevron Contract

Wood Group has secured an extension to continue to support Chevron Upstream Europe across four offshore assets in the North Sea. Wood Group PSN (WGPSN) will deliver

QP, Chevron Ink Offshore Moroccan Deal

Qatar Petroleum has reached an agreement with Chevron Morocco Exploration Ltd., a subsidiary of Chevron Corporation, to acquire a 30% participating interest from

 
 
Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0720 sec (14 req/sec)