Coast 2050 Study Agreement Signed

Thursday, March 02, 2000
The New Orleans District, USACE and the Louisiana Department of Natural Resources held an historic signing ceremony to launch a major coastal wetlands study. With the signing of the Coast 2050 Feasability Cost Share, the agencies will initiate a $6 million feasibility study of the Barataria Basin. The study will be completed in September 2001. "This is more than just another study," sais Congressman Billy Tauzin of Chackbay, who headed the effort to secure federal funding. "This is the beginning of a comprehensive, aggressive plan to save Louisiana's coastaline." The Barataria Basin was selected as the first area for study because it is the most critical, losing about 11 square miles annually. The study will focus on marsh creation, barrier island restoration and river diversion strategies. Other coastal feasibility studies are planned in the future.

Contracts

BP, ExxonMobil, ConocoPhillips 'Quit' Alaska LNG Project

BP, Conoco Phillips, and Exxon Mobil said that the 65-billion dollar megaproject would be too unprofitable for them to move into the next phase of development.

C-Job Designs Flettner Freighter for Switijnk

The Dutch shipping company family Switijnk has contracted C-Job Naval Architects to develop a Rotor Sail-equipped design to meet their specific loading and sailing profile.

Yangzijiang Shipbuilding to Slash 2,000 More Jobs

Chinese shipbuilder Yangzijiang Shipbuilding Holdings Ltd said it plans to cut 2,000 additional jobs, just under 10 percent of its current workforce, stepping up

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0565 sec (18 req/sec)