South Korean January Ship Orders Increase

Friday, February 11, 2000
New orders received by South Korean shipbuilders in January totaled 1.06 million gt, up 164.7 percent from the same month a year earlier, provisional figures from the Korea Shipbuilders' Association showed. South Korean shipbuilders received orders for 16 ships in January, the association said. Orders received in January last year totaled 400,556 gt for four ships, it said. Ships completed in January were down from the same month a year earlier. Seventeen ships totaling 956,081 gt were finished, compared to 23 vessels at 1.22 million gt, it said. South Korea's backlogged orders at the end of January amounted to 24.30 million gt for 389 ships, against 20.35 million gt for 314 ships a year earlier.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

TOTE’s 2nd LNG Containership Launched

Shipping company TOTE and shipbuilder NASSCO on Saturday launched Perla del Caribe, the second of two Marlin Class ships – the first containerships in the world to be powered by natural gas.

HHI Orders Regasification Systems from Wärtsilä

South Korean shipyard Hyundai Heavy Industries (HHI) has ordered two seawater/propane based regasification modules from Wärtsilä. The systems are to be installed

HMAS Canberra Initial Operational Capability

The Royal Australian Navy’s Amphibious Ship, HMAS Canberra, has completed a graduated operational test and trials program to achieve a key milestone towards Initial Operating Capability.

Contracts

ME Production Receives Two Scrubber Orders

ME Production subsidiary Marine Exhaust Technology has been awarded a new contract for the DFDS vessel Finlandia sailing on the route Rosyth-Zeebrugge. The scrubber contract includes design,

Asia-N.Europe Box Rates Jump 26 pct

Shipping freight rates for transporting containers from ports in Asia to Northern Europe jumped by 26 percent to $591 per 20-foot container (TEU) in the week ended on Friday,

CMA CGM-led Consortium Win Box Terminal Bid

The consortium formed by CMA CGM, Bolloré and CHEC won the bid process initiated by the Cameroonian government Following the bidding procedure initiated by the Cameroonian government,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.7700 sec (1 req/sec)