Vessel Conversion Completed

Wednesday, January 26, 2000
Eclipse, a converted 210 ft. cruise ship, recently began operating in the Galapagos Island Cruise business. The vessel conversion was designed by DeJong and Lebet, Inc., Naval Architects, Jacksonville. Eclipse was originally constructed as ferry vessel Aegean Sea, for service in the Mediterranean by a Spanish shipyard in 1982. The current owners bought the vessel in 1997 and began the conversion process. The original vessel was laid out as an 800-passenger day ferry. The vessel's passenger lounges were completely stripped. The second level was extended and a third enclosed level was created on a formerly open deck. The existing swimming pool was refurbished. The resule is a modern, nicely-furnished overnight cruise ship with 27 comfortable staterooms and a capacity of 48 passengers and 28 crew. The staterooms are located on the main deck and third deck, including four suites on the third deck. All of the staterooms are furnished by Marine Accommodations. All interior spaces were fitted with new modern air conditioning and ventilation systems, including fresh air replacement capability. Other interior accommodations include refurbished crew staterooms, separate passenger dining room and lounge on the second deck and a library area. A new large size stair tower was added for increased safety. The vessel is powered by the original Deutz engines, 1,175 hp each. The existing Deutz generators were also re-used. A new emergency generator was added. Length, overall: 210 ft. Beam, molded: 41 ft. Depth: 14.1 ft. Draft: 10.5 ft.
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

Greek Shipping Mulls Cyprus Move

Greek shipping companies are looking into moving to Cyprus due to the instability and uncertainty in Greece, it emerged, reports Cyprus News Agency.   The director

Container Equipment Costs at Record Low

Low material costs and stable demand has driven the price of new container equipment down to record lows where it is forecast to stay, according to the latest edition

KPA: Striking Mombasa Port Workers Must Return by Friday

The Kenya Ports Authority said on Thursday striking workers at the Mombasa port should resume work by Friday morning or lose their jobs, and that normal activities

 
 
Maritime Contracts Maritime Security Naval Architecture Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1094 sec (9 req/sec)