Frink Retires From Parker Drilling

Friday, December 17, 1999
Shelby Frink, vice-president of operations support, retired from Parker Drilling Company after 43 years of service with the company. He began his career with Parker in 1956 as a roughneck working in Texas and New Mexico. He worked his way through the ranks of the company by holding several international field and management positions. In 1975, Frink assumed the role of Western Hemisphere operations manager and in 1978 moved to Easstern Hemisphere operations manager. In 1986, he was promoted to vice-president of Eastern Hemisphere operations until 1993, when he assumed his current position and title.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

North Sea Atlantic Joins the Technip fleet

On Saturday July 26, 2014, a ceremony was held in Bergen to officially name the latest new subsea construction vessel to join the Technip fleet, the North Sea Atlantic.

Coast Guard Responds to Grounded Freighter in Lake St. Clair

The Coast Guard has responded Sunday to a 656-foot freighter that was hard aground in the downbound shipping channel of Lake St. Clair. Initial reports indicate

Private Buyers in Iran Look to Boost Grain Market

One sign of change in Iran as it works toward a nuclear deal with world powers is the way it is feeding itself, with private grain firms beginning a slow return

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0856 sec (12 req/sec)