Todd Shipyards to Perform Overhaul

Friday, November 12, 1999
Todd Pacific Shipyards Corp. received a $29 million contract from the Washington State Ferry Systems for the overhaul of its ferry M/V Yakima. The overhaul encompasses replacement of most of the lower vehicle deck; installation of the vessel's new furniture and fixtures; removal and reinstallation of propulsion motors, main diesel engines and propulsion generators. The work, which began upon the vessel's arrival at the shipyard on October 22, is expected to last 15 months.
Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


TMS Cardiff Gas Orders First LPG Carriers

TMS Cardiff Gas Ltd. has signed a contract with Hyundai Heavy Industries of Korea for the construction of two 78,700 cbm LPG carriers with the option to build another two.

Japan’s First ME-GI Engine Passes Factory Tests

The factory acceptance test (FAT) of the first ME-GI engine in Japan recently took place at the Tamano Works of Mitsui Engineering & Shipbuilding Co., Ltd. (MES),

Damen's Third Ferry for South Korea

All good things come in threes as Damen delivers the third vessel of the year, from the Damen Fast Ferry (DFFe) series to South Korean operators. Having already

Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1030 sec (10 req/sec)