Todd Shipyards to Perform Overhaul

Friday, November 12, 1999
Todd Pacific Shipyards Corp. received a $29 million contract from the Washington State Ferry Systems for the overhaul of its ferry M/V Yakima. The overhaul encompasses replacement of most of the lower vehicle deck; installation of the vessel's new furniture and fixtures; removal and reinstallation of propulsion motors, main diesel engines and propulsion generators. The work, which began upon the vessel's arrival at the shipyard on October 22, is expected to last 15 months.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Fincantieri Invests In Camper & Nicholsons

Fincantieri has signed an agreement for the acquisition of a minority stake via capital injection in Camper & Nicholsons International (Camper & Nicholsons), the

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1124 sec (9 req/sec)