Todd Shipyards to Perform Overhaul

Friday, November 12, 1999
Todd Pacific Shipyards Corp. received a $29 million contract from the Washington State Ferry Systems for the overhaul of its ferry M/V Yakima. The overhaul encompasses replacement of most of the lower vehicle deck; installation of the vessel's new furniture and fixtures; removal and reinstallation of propulsion motors, main diesel engines and propulsion generators. The work, which began upon the vessel's arrival at the shipyard on October 22, is expected to last 15 months.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

Messer to Debut MetalMaster Xcel

Messer Cutting Systems said it has answered the call from manufacturers that have been demanding a faster, more accurate way of producing cut parts. Messer’s

Rolls-Royce Expands in the Canary Islands

Rolls-Royce announced it has signed a cooperation agreement with the Astican Shipyard in Las Palmas, Canary Islands that it said will enhance the service capabilities

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.6718 sec (1 req/sec)