Minoan Flying Dolphins To Order Three Ferries

Friday, October 01, 1999
Minoan Lines subsidiary Minoan Flying Dolphins will reportedly order three more high speed ferries at a cost of $150 million, bringing its total newbuildings to eight. The three new ferries will have a cruising speed of 30 knots and are expected to be delivered in Summer 2001, doubling the company's fleet of high speed ferries. Each of the ferries will be 459 ft. (140 m) long and have a capacity of 1,800 passengers and 250 cars, or 40 trucks and 100 cars.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Fincantieri Invests In Camper & Nicholsons

Fincantieri has signed an agreement for the acquisition of a minority stake via capital injection in Camper & Nicholsons International (Camper & Nicholsons), the

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

 
 
Maritime Contracts Maritime Security Navigation Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1669 sec (6 req/sec)