Atlantic Marine Cuts Steel On AMCV Vessel

Tuesday, October 05, 1999
Atlantic Marine, Jacksonville, Fla., has accomplished its first cut of steel for its new fleet of 226-passenger U.S.-flag coastal ships, Delta Queen Coastal Cruises. The steel cut begins construction for AMCV, who in May 1999, signed a $60 million contract with Atlantic for construction of the first two vessels, as well as an option for a third. Measuring 300 ft. (91.4 m), the diesel-driven, coastal ships with nautical and Federal-style decor is scheduled to enter service in 2001 along the East Coast of America. "This project is on a fast track," said Scott Young, executive vice president of AMCV and president of The Delta Queen Steamboat Co. "Four hundred tons of steel have been delivered to the shipyard and sub-assembly is underway on the vessel modules."
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Marad Visits TX Maritime Technology & Training Center

United States Maritime Administration tours Maritime Technology and Training Center site.   Administrators from the United States Maritime Administration (MARAD),

ISS Announces CEO Transition

Captain Claus Hyldager yesterday decided to step down as the Chief Executive Officer of Inchcape Shipping Services (“ISS”).    The current Chief Financial Officer,

CME Lifts Force Majeure for all Illinois River Grain Terminals

CME Group has lifted its declaration of force majeure at all Illinois River terminals that are regular for Chicago Board of Trade corn and soybean futures delivery,

Shipbuilding

Pressure for Australia Sub Deal Grows

Australia to spend A$65 bln on ships and subs over 20 years; PM pledges A$40 bln for domestic shipbuilders. Australia will spend A$89 billion ($65 billion) on

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

LNG Ferry Construction for Tallink Begins

The start of production of Tallink's new generation LNG powered fast ferry for the Tallinn-Helsinki route was celebrated on the 4th of August 2015 at Meyer Turku shipyard.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4842 sec (2 req/sec)