Foss Maritime Aids Power Plant Reactor Tow

Friday, September 24, 1999
Foss Maritime played a crucial role in the success of the towing of a defueled nuclear reactor up the Columbia River for burial of the reactor at the Hanford Nuclear Reservation, near Richland, Wash. Under a contract from Portland General Electric, Foss managed and performed barging of the 1,020 ton load from PGE's decommissioned Trojan power plant, near Rainier, Ore., to the Richland barge slip at the Port of Benton. The 270-mile tow was performed by Foss tugs Lewiston and Noydena. Foss towed ZB-240, a 240 x 56 ft. ramp barge, specifically built for the reactor towing assignment by Zidell Marine Corporation. The barge was chartered by PGE from Zidell. During the 36 hour tow, both 2,500 hp Lewiston and 1,700 hp Noydena were secured side by side at the stern of the RoRo barge so each tug's crew had a clear line of sight beyond the towering reactor and its support frame aboard the barge forward of the tugs. In addition to the backup tug, extensive safety precautions required by PGE under its contract with Foss included special nuclear cargo handling and transport training for Foss barge ballasting/deballasting and towing personnel. Special surveys of the barge and tugs were among other safety related requirements. During training sessions, as well as the actual move, the barge was ballasted onto and deballasted off of the bottom of the Trojan barge slip.
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

China Unveils Action Plan on Maritime Silk Road

China has unveiled the principles, framework, and cooperation priorities and mechanisms in its Maritime Silk Road initiative in a bid to enhance regional connectivity

JV Wins $2bln Freeport LNG Contract in US

A joint venture (JV) between CB&I, Chiyoda International and Zachry Industrial has won a contract worth over $2bn from FLNG Liquefaction 3 for a liquefied natural

Feds Delay LNG’s Port Ambrose Application

The US Coast Guard and the US Maritime Administration (MARAD) have temporarily suspended their review of the proposed Port Ambrose deep-water LNG import terminal.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2493 sec (4 req/sec)