Atlantic Marine Completes First Steel Cut

Wednesday, September 22, 1999
Atlantic Marine, Jacksonville, Fla., has accomplished its first cut of steel for its new fleet of 226-passenger U.S.-flag coastal ships, Delta Queen Coastal Cruises. The steel cut begins construction for AMCV, who in May 1999, signed a $60 million contract with Atlantic for construction of the first two vessels, as well as an option for a third. Measuring 300 ft. (91.4 m), the diesel-driven, coastal ships with nautical and Federal-style décor are scheduled to enter service in 2001 along the East Coast of America. "This project is on a fast track," said Scott Young, executive vice president of AMCV and president of The Delta Queen Steamboat Co. "Four hundred tons of steel have been delivered to the shipyard and sub-assembly is underway on the vessel modules."
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Great Lakes Shipyard to Build Guatemalan Harbor Tug

U.S. shipbuilding and repair yard Great Lakes Shipyard informs it has signed a contract to build another of its HandySize Class, 3,400 HP twin-screw tugboat for

BAE Systems Welcomes Record Number of Paid Interns

More than 140 university students from across the country are being given a unique insight into working life at BAE Systems, as part of the company’s 12-week summer internship program.

Drydocks World World’s Largest Turret

Drydocks World marked a milestone in completing the world’s largest turret mooring system. At almost 100 meters high, weighing over 11,000 tons and with a diameter of 26 meters,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2712 sec (4 req/sec)