Halter Marine to Build Ferries for State Transportation Department

Friday, August 27, 1999
A $10.7 million contract was awarded to Halter Marine Group for construction of two passenger ferries for North Carolina's Department of Transportation. The 180 ft. ferries, being built at Halter's shipyard in Moss Point Marine are scheduled for delivery to Havelock, N.C. in March 2000 and Southport, N.C. in July 2000. Two Caterpillar 3412 diesel engines will power the ferries with a minimum of 475 hp at 1,200 rpm. The all-steel, three-deck ferries can hold up to 300 passengers and 40 cars and trucks complete with a full range of communications and navigational equipment that will assist with steering and mooring. Known as a provider of design, construction and repair for offshore vessels and drilling rigs, Halter has built ferries for shipyards both in the U.S. and abroad.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

New AVEVA ISM Bridges the Gap

AVEVA launches a new application for governing asset information using a standards-based methodology. AVEVA announced the launch of AVEVA Information Standards Manager (AVEVA ISM),

General Dynamics gets $25 mi GPS Contract from Lockheed Martin

General Dynamics Advanced Information Systems, a business unit of General Dynamics, was awarded a $25.4 million full-production contract from Lockheed Martin to support the U.

Globecomm to Provide VSAT for PBJV Barge

Purpose-built accommodation and pipe-lay barge on charter to Petronas equipped with VSAT and L-Band services. Globecomm Maritime has been awarded a contract

Offshore

Total E&P is First to Use FROG-XT4

Total E&P is the first to use Reflex Marine’s newly developed FROG-XT4 on the Odudu field in Nigeria. The French operator purchased the crew transfer device

New Standard gets Revised Program for Cooper Basin Approved

New Standard Energy Limited (New Standard) advises that it has received approval for amendments to its five year work program in PEL570 in the Cooper Basin. As part of the revised program,

Floating Production: $1.2b Speculative FLNG Ordered

The floating production business continues to be very strong, particularly in the LNG gas processing sector.  Last month saw a speculatively ordered floating liquefaction plant – a $1.

 
 
Maritime Contracts Maritime Security Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1193 sec (8 req/sec)