FGH Completes Rig Repair

Thursday, July 26, 2001
Friede Goldman Halter, Inc. (FGH) announced that FGO, the company's rig segment, has completed repairs to the Noble Amos Runner, an EVA 4000 semisubmersible which was damaged by an offshore supply vessel (OSV) during drilling operations. The rig had to undergo replacement of damaged structural elements. Noble also utilized the time to perform other minor modification work. The rig departed on budget and ahead of schedule. "We are very cognizant of the revenue loss our customers may suffer if their work is delayed. Meeting or beating their schedule is important to us and our customers," stated Anil Raj, chief operating officer of Friede Goldman Halter. The Noble Amos Runner is among several projects including two (2) power barges, a jackup repair, a drillfloor/substructure package and the shipyard phase of Bingo 1 recently completed by Friede Goldman Offshore. Friede Goldman Offshore previously converted the rig into an EVA 4000 and delivered the Noble Amos Runner to Noble in August 1999.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Dool to Serve as Chair of SLSMC Board

The St. Lawrence Seaway Management Corporation (SLSMC) announced that Tim Dool has been named as Chair of the Board of Directors, effective September 1. Dool was

Bollore First Half Boosted by Transport, Advertising Unit

French industrial group Bollore said first-half operating income rose 11 percent to 314 million euro because of strength at its transport business and advertising agency Havas,

Scrap Metal Exporter Pens Terminal Agreement

Port Canaveral Scrap Terminal LLC (PCST), a bulk ferrous scrap exporter, has signed a lease with the Canaveral Port Authority to operate a terminal in the north cargo area at Port Canaveral.

Offshore

Odfjell Drilling in Tighter 2Q North Sea Market

Odfjell Drilling reports second quarter 2014 financial results showing a profit of US$29-million. Profit & loss Q2 2014 Operating revenue for Q2 2014 was USD 272 million (USD 289 million),

Brazil AHTS Contract Breakthrough for Havyard

Havyard says it is to deliver the ship design and equipment for four anchor handling tug supply (AHTS) vessels that are to be built and operated by the Brazilian

EOC Takes Full Ownership of OSVs

On 26 August 2014, EOC Limited agreed to acquire 50% of the entire issued share capital of Lewek Antares Shipping Pte. Ltd. (the "Target") , a company incorporated under the laws of Singapore,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1528 sec (7 req/sec)