Two Die As Typhoon Pabuk Packs A Powerful Punch in Japan

Tuesday, August 21, 2001
Powerful Typhoon Pabuk, packing winds of up to 79 mph, ploughed into Japan on Tuesday, killing two people, snarling air, sea and rail traffic and forcing Universal Studios to close its theme park.

The typhoon landed at around 7:00 p.m. in the western prefecture of Wakayama, becoming the first typhoon to hit Japan's main island of Honshu in two years, the Meteorological Agency said.

Local officials issued evacuation recommendations for 7,000 Wakayama residents as the storm pounded the district.

The agency warned that Pabuk - a Laotian word for a large, freshwater fish - could make a direct strike on central Japan, near Tokyo, early Wednesday and then pound its way north through Honshu. It was moving at about 20 kph (12.5 mph).

A railway worker was electrocuted while removing branches from an overhead train cable, police said.

A 66-year-old man died when he fell from the roof of a ceramics factory in central Aichi, a police spokesman said. He was cleaning a gutter to prepare for the typhoon.

Kyodo news agency said 16 people were injured, most knocked down by the powerful winds. "We believe it will maintain its current strength as it moves northward," a Meteorological Agency official said.

The storm had whipped up high waves along the coast and heavy rains across much of Honshu, and it was expected to dump up to 12 inches of rain in some areas of southwestern and central Japan, while 6-8 inches were forecast for the area surrounding the western city of Osaka, Japan's second-largest metropolitan area.

The storm forced cancellations of at least 30 international flights including Continental Airlines flights bound for Guam and Saipan from Nagoya in central Japan. In addition, many domestic ferries and all high-speed boats to the South Korean port of Pusan were cancelled. - (Reuters)

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

MN 100: BAE Systems Ship Repair

750 W. Berkley Avenue Norfolk, VA 23523 Tel: (757) 494-4674  Email: john.measell@baesystems.com Website: www.baesystems.com/shiprepair President: William Clifford The Company: BAE Systems,

Signet Tows Aircraft Carrier on Final Voyage

The final voyage of aircraft carrier USS Saratoga begins today. From the Eastern Hemisphere to the Western Hemisphere, the USS Saratoga has made her mark around the globe,

Environmental

Revision Proposed for Fishing Vessel Cargo Regs

The U.S. Coast Guard (USCG) proposed revisions to its regulations for commercial fishing vessels carrying flammable or combustible liquid cargos in bulk. The

Foster Wheeler to Supply Heat Recovery Steam Generator In Mexico

Foster Wheeler AG (Nasdaq:FWLT) announced today that a subsidiary of its Global Power Group has been awarded a contract by Iberdrola, for the design and supply

Hiab to Present Sustainable Technology Load Handling at Elmia Lastbil Fair

Hiab, part of Cargotec, will showcase its latest sustainable technology of load handling at the Elmia Lastbil fair in Sweden. The presented products include

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1400 sec (7 req/sec)