Titan Maritime Rolls Out The Bunker In Portugal

Wednesday, August 08, 2001
Titan Maritime recently completed a wreck removal of M/V Coral Bulker in Viana de Castelo, Portugal. The 28,454-dwt bulker went aground with a cargo of wood chips and timber en route from Tallinn to Viana de Castelo. Rough seas and high winds forced the vessel to ground next to the port village's breakwater on Christmas Morning 2000. As a result, the vessel's double bottoms were breached, which led to the flooding of the engine room. Upon award of the contract, Titan immediately began mobilization of equipment. A total of 25 Titan personnel, including a salvage master, diver/salvors, on-shore coordinator and hydraulic engineers were sent to the site. Titan's approach to this wreck removal was different in that they proposed to roll the whole ship onto the breakwater, enabling them to dismantle the vessel while working in the dry. Rather than using pulling forces to right a vessel, forces were applied to roll the vessel over. Titan proposed a reverse pairbuckling operation, which was accomplished by first emptying the ship of its entire cargo of wood chips and timber. With the cargo holds empty, Titan began removing the ship's superstructure. Titan then cut the vessel in two by using a 17-ton drop chisel suspended and repeatedly dropped from one of the vessel's deck cranes, which was intentionally left for this purpose.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

Marad Celebrates Deployment of Maritime Fuel Cell Project

The U.S. Department of Transportation’s Maritime Administration (MARAD) today celebrated the launch of field trials for the first prototype hydrogen fuel cell

Eniram Expands Training Services, Onboard and Onshore

Eniram Ltd, a provider of energy management technology and analytic services to the shipping industry, today announced the addition of in-depth training services

Royal IHC successfully launches TSHD MAHURY

On 14 August, Royal IHC successfully launched the MAHURY, a 1,840m3 capacity twin-screw trailing suction hopper dredger (TSHD), at partner shipyard MTG Dolphin Shipyard in Varna, Bulgaria.

Ship Repair & Conversion

China’s Shipyards Face Tough Times

As the shipping market continues its prolonged downturn five shipyards have filed for bankruptcy this year, reports SCMP.   China's leading private shipyards

Ferguson to Build Two CalMac Ferries

Scottish minister Nicola Sturgeon have named Ferguson shipyard as the preferred bidder for a £97 million contract for the biggest new ferries on the Clyde since

Private Ship Repair Moves Dry Dock Timelines

A delay in private repairs to the hospital ship Africa Mercy has caused a two-and-a-half week adjustment of timelines for Transnet National Ports Authority’s R30

 
 
Maritime Contracts Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.5116 sec (2 req/sec)