Titan Maritime Rolls Out The Bunker In Portugal

Wednesday, August 08, 2001
Titan Maritime recently completed a wreck removal of M/V Coral Bulker in Viana de Castelo, Portugal. The 28,454-dwt bulker went aground with a cargo of wood chips and timber en route from Tallinn to Viana de Castelo. Rough seas and high winds forced the vessel to ground next to the port village's breakwater on Christmas Morning 2000. As a result, the vessel's double bottoms were breached, which led to the flooding of the engine room. Upon award of the contract, Titan immediately began mobilization of equipment. A total of 25 Titan personnel, including a salvage master, diver/salvors, on-shore coordinator and hydraulic engineers were sent to the site. Titan's approach to this wreck removal was different in that they proposed to roll the whole ship onto the breakwater, enabling them to dismantle the vessel while working in the dry. Rather than using pulling forces to right a vessel, forces were applied to roll the vessel over. Titan proposed a reverse pairbuckling operation, which was accomplished by first emptying the ship of its entire cargo of wood chips and timber. With the cargo holds empty, Titan began removing the ship's superstructure. Titan then cut the vessel in two by using a 17-ton drop chisel suspended and repeatedly dropped from one of the vessel's deck cranes, which was intentionally left for this purpose.
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

Nordic Yards Delivers 'Wind Server'

Nordic Yards officially handed over the offshore service vessel to the Danish company DBB Jack-Up Services A/S. During the handover ceremony, the ship was named ‘WIND SERVER’.

NRL Researchers Demo Ship-to-Shore Data Link

Scientists at the U.S. Naval Research Laboratory (NRL) along with Mercury Continuity (MC) have demonstrated the Tactical Reachback Extended Communications (TREC) system in the port of Miami.

NASSCO Opens Bremerton Repair Facility

General Dynamics NASSCO celebrated the grand opening of its new location in Bremerton, Wash., yesterday. The facility will support the company’s recently-awarded contract to repair and maintain U.

Ship Repair & Conversion

US Fleet to Pump $75m into Great Lakes Shipyards

U.S.-flag Great Lakes vessel operators plan to spend $75 million this winter to ready the fleet for the 2015 shipping season, the Lake Carriers’ Association (LCA) reported.

Keeping to the Schedule in the Pacific Northwest

When a tightly scheduled repower for the Kodiak-based trawler Sea Mac in early December took a very bad turn, Mike Fourtner used his 25 years of fishing experience

Optimarin ,Goltens Ink BWT Retrofit Agreement

Ballast Water Treatment (BWT) specialist Optimarin and Goltens, a provider of engineering and installation solutions for the shipping industry, have signed a nonexclusive

 
 
Maritime Standards Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1174 sec (9 req/sec)