A&P Shipcare Completes Repairs Aboard American Cormorant

Thursday, September 13, 2001
The 52,092 dwt U.S.-registered Heavy Lift Vessel 'American Cormorant' left Southampton on 2nd September after its annual lay over during which A&P Shipcare - Southampton carried out various works. The 1975-built 'American Cormorant' was in the Southampton area for a visit to the Combat Equipment Battalion in Hythe. The vessel arrived in Southampton on 8th June and sailed on 29th August. The work completed by A&P Shipcare included various tank repairs which entailed bulkhead steel repairs, steel pipe refurbishment and repairs and replacement of heavy duty plastic pipe, a task which previously had never been carried out by A&P Shipcare - Southampton. A&P also supplied steelworkers and riggers for de-lashing work of her cargo, which comprised three tugs, three landing craft, a crane barge, a flat barge and two LCM (small landing craft), when the vessel was berthed at Gillkicker Point, Solent on 4th June. The second stage of the work involved the removal of deck cargo cribbing arrangements to carry out deck repairs. The operators of 'American Cormorant' - Osprey Ship Management Inc. are said to be very pleased with the work that A&P Shipcare - Southampton had completed and very impressed with the quality of workmanship. A&P Shipcare operates a 24 hour/day, 365 days/year service to shipowners from bases in all the main A&P shipyards (Tyne, Chatham, Southampton and Falmouth) and in additional locations at Ramsgate, Dover, Tilbury and Aberdeen.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Combat Cold Corrosion via Condition Monitoring

Parker Kittiwake explains why frequent condition monitoring is the most effective measure in combating the recent cold corrosion phenomenon The recent trend in

Hyde Marine, Goltens Enter Engineering Agreement

Hyde Marine, Inc., announced today it has launched an agreement with Goltens Green Technologies division to help shipowners determine how to best fit the chemical

Offshore

New Standard gets Revised Program for Cooper Basin Approved

New Standard Energy Limited (New Standard) advises that it has received approval for amendments to its five year work program in PEL570 in the Cooper Basin. As part of the revised program,

Floating Production: $1.2b Speculative FLNG Ordered

The floating production business continues to be very strong, particularly in the LNG gas processing sector.  Last month saw a speculatively ordered floating liquefaction plant – a $1.

FLNG Prelude: A New Dawn in the Age of Maritime & Energy

Longer than four football fields, as big as six Nimitz-class aircraft carriers and almost as tall as the Taipei 101 skyscraper, Royal Dutch Shell PLC is hoping that its record-setting,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1679 sec (6 req/sec)