Frontline Sells Suezmax Tanker

Monday, May 14, 2001
Frontline has entered into an agreement to sell one of its 2000-built Suezmax tankers, Front Archer. Front Archer was designed and built with future employment as shuttle tanker in mind and is equipped with controllable pitch propeller and thruster tunnel. It is the buyer's intention to use the vessel in shuttle operations. Frontline took delivery of the Front Archer in February 2000 and the vessel has traded in the spot market from delivery. The vessel is expected to be delivered to the buyer in July/August 200. Frontline expects to book a profit of approximately $20 million and to release about $ 32 million in liquidity. Frontline did not fully utilize the technical capacity of Front Archer in regular trading. In view of this and in view of the fact that Frontline's newbuilding program after acquisition of Mosvold already includes two Suezmaxes and six VLCCs the Board has decided to accept the price offered for Front Archer. - (Reuters)
Maritime Reporter October 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Retailers Well Stocked as Holidays Approach

Import cargo volume at the nation’s major retail container ports is expected to increase 3.3 percent this month over the same time last year as retailers make final

Commodities See Biggest Price Jump in 3 Years

Commodities jumped on Friday, headed for their largest weekly gain in more than three years as base metals roared higher after Glencore pledged to slash zinc output

Chevron Cylinder Oil Gains NOL from Wärtsilä

Chevron Marine Lubricants’ 100BN cylinder oil, Taro Special HT 100 has received approval for its use in another engine range – products made by Winterthur Gas & Diesel Ltd.

Ship Sales

Tsakos Fixes Three LR2s on Timecharter

Crude, product and LNG tanker operator Tsakos Energy Navigation Ltd (TNP) announced the charter for an average of 36-months per vessel for its three LR2 Aframax

IRISL Looks West with New Vessels

The Islamic Republic of Iran Shipping Lines (IRISL) plans to become one of the world's top ten shipping lines. It plans to modernize its fleet and ally with international

Azerbaijan to Get New Passenger Vessel This Year-end

Azerbaijan Caspian Shipping Company  expects to get the first of the three passenger vessels being built currently at the Baku Shipbuilding & Repair Plant (Baku Shipyard LLC) until the end of 2015,

Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Port Authority Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1560 sec (6 req/sec)