Alstom Wins Repeat Order For Cable Layer

Thursday, October 07, 1999
The Marine and Offshore division of Alstom Drives & Controls has been awarded a contract by James Fisher & Sons to provide a replacement power management, alarm and monitoring system for installation on the C/S Nexus cable layer. This is the second such order for Alstom from James Fisher, who granted the company a contract in 1993 for the supply and installation of a DPS901 Simplex Dynamic Positioning System onboard the same vessel. The new power management system utilizes the same hardware as the positioning system, complementing the Alstom equipment already in use of the C/S Nexus.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Brent Holds Above $97, Eyes Worst Quarter Since 2012

Brent crude futures hovered above $97 a barrel on Tuesday, aided by firm U.S. and Chinese data, but the oil benchmark was on track for its deepest quarterly drop

MAN Propulsion Packages for New Icelandic Trawlers

MAN Diesel and Turbo inform that Icelandic owners, HB Grandi, Vinnslustodin hf. and Hradfrystihusid Gunnvör, have ordered newbuildings based on two different ship

IRPT, Community College MoA on Maritime Training

The Inland Rivers, Ports and Terminals (IRPT) Trade Association announced today that it has entered into a memorandum of understanding with Lewis & Clark Community

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1258 sec (8 req/sec)