Alstom Wins Repeat Order For Cable Layer

Thursday, October 07, 1999
The Marine and Offshore division of Alstom Drives & Controls has been awarded a contract by James Fisher & Sons to provide a replacement power management, alarm and monitoring system for installation on the C/S Nexus cable layer. This is the second such order for Alstom from James Fisher, who granted the company a contract in 1993 for the supply and installation of a DPS901 Simplex Dynamic Positioning System onboard the same vessel. The new power management system utilizes the same hardware as the positioning system, complementing the Alstom equipment already in use of the C/S Nexus.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Ballast Water System Retrofits for 11 Containerships

Eleven container vessels owned by Bernhard Schulte GmbH & Co. KG, based in Germany, are to be retrofitted with Wärtsilä Aquarius Ballast Water Management Systems (BWMS), Wärtsilä announced today.

Timing in Doubt on Hapag-Lloyd IPO

German container shipping group Hapag-Lloyd has taken further steps in preparation of a stock market listing and has mandated more banks for the move, but it remains

Asia Tankers-VLCC Rates Will See More Volatility

VLCC market to be "hot" in Q4 -VLCC broker. Freight rates for very large crude carriers (VLCCs) face a roller-coaster ride on uncertain cargo volumes and vessel

 
 
Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3535 sec (3 req/sec)