Flender Werft Books Three More Contracts

Monday, May 21, 2001
Three shipbuilding contracts exceeding 400 million DM became effective last week at Lübeck, Germany based Flender Werft. The contracts include a RoRo passenger ferry for Smyril Line of the Faroe Islands, which will be built in accordance with the plans and documents of Flensburger Schiffbau-Gesellschaft. In addition, a pair of 3,600-TEU containerships will be built for Hamburg-based shipowner Claus-Peter Offen. These newbuildings will be initiated directly following the Superfast Ferries currently under construction at the yar, and will keep the yard fully occupied to the start of 2003.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Maersk Line Names Hahnemann Chief HR Officer

On August 1, 2016, Ulf Hahnemann, current Vice President for Strategic Programs at Mars Inc. will join Maersk Line as Chief Human Resources Officer (CHRO) and be

American Waterways Operators Elects Chairman

The members of the American Waterways Operators, the national trade association representing the tugboat, towboat and barge industry, elected a new slate of leaders

Hanjin Shipping May Get OK for Restructuring

South Korea’s largest container operator by capacity Hanjin Shipping's creditors are expected to approve a corporate rehabilitation program for the struggling container line,

Shipbuilding

GE Gas Turbines for Japan's New Warship

GE's Marine Solutions announced it will provide IHI, Tokyo, Japan, with two LM2500 aeroderivative marine gas turbines for the Japan Maritime Self Defense Force's (JMSDF) new 8,

US Tests World's Largest Unmanned Sub Hunter

The US military is beginning testing on the world's largest unmanned ship - a self-driving 40-metre vessel designed to travel thousands of kilometres out at sea without a single crew member on board.

Partners Tap Standardization to Trim Newbuild Costs

Unfamiliar specifications and processes often result in rework, delays and misunderstandings, and are adding thousands of engineering hours to the design and construction

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0826 sec (12 req/sec)