CSL Niagara Christened

Monday, August 02, 1999
The largest-ever Canadian ship built for the Great Lakes-St. Lawrence was blessed at a ceremony last June at the Lake Ontario entrance to the Welland Canal at Port Weller Drydocks. The vessel is the newest member of the Canada Steamship Lines (CSL) fleet, and the first of a trio of ships to be constructed by Port Weller as part of a $100 million fleet reinvestment program by CSL. Measuring 740 x 78 x 48, the newbuild required more than 6,000 tons of steel. This grand project also included the construction of a new hull, which was joined to the engine room portion of the J.W. McGiffin. Featuring the most advanced self-unloading system available, the Niagara is the premiere ship to be built to the St. Lawrence Seaway's new maximum-size allowances.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Egypt Picks Jordan LNG Cargo Winners

Egypt has picked Shell, Vitol and Trafigura in a tender to supply four cargoes of liquefied natural gas (LNG) via Jordan's Aqaba import terminal, trade sources said.

Cameroon Awards Kribi Deepwater Contract

Cameroon has awarded a contract for its Kribi port to a consortium led by French logistics group Necotrans, the two parties said. The deepwater port will allow

USCG Rescues Unconscious Boater

The Coast Guard rescued an individual from a marsh flat in Barataria Waterway located approximately six miles north of Grand Isle, Tuesday. Coast Guard Sector

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.7678 sec (1 req/sec)