Panama Canal Authority Reduces Time

Thursday, November 21, 2002
The Panama Canal Authority (ACP) announced that it has reduced by 16.6 percent, the time a vessel spends in Canal waters until it completes its transit through the waterway. The average Canal Waters Time (CWT) for 2001-2002 was 26.2 hours, compared to an average CWT of 31.4 hours for 1999-2000. The difference represents a 5.2-hour average savings to vessels on each trip through the Canal. Moreover, the reduction was more dramatic for shippers using the Canal's "reservation system," where ships are able to reserve an exact date to transit the Canal, resulting in precise scheduling. Ships that employed the reservation system took only 18.6 hours to transit the Canal. "Reducing the passage time for vessels saves our customers a lot of money in fuel and other costs and it allows them to get their goods to the market faster. We are running the Canal like a business -- with a market-oriented approach -- so we are constantly striving to improve services and provide new products for our customers. I give credit to our management team for their tenacious efforts to enhance Canal operations and increase the reliability of our service," said ACP Administrator Alberto Alemán Zubieta. The ACP attributed the reduction to, in part, its permanent modernization program, which has recently widened the Gaillard Cut, increased the Canal's locomotive fleet from 80 to 100, and acquired more powerful and maneuverable tugs.
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

KEP Marine Unveils KMGBL

KEP Marine – the manufacturer of type approved displays, computers and peripherals, announced  the release of the affordable, high-quality KMGBL Glass Bridge Light Displays.

New Load Measurement Solution for Port of Dampier

Strainstall designs and delivers a load measurement solution for the world’s largest floating wharf at Port of Dampier.   Strainstall, part of James Fisher and Sons plc,

Rolls-Royce Power Package for USS Zumwalt

Rolls-Royce announced delivery of the twin fixed pitch propellers to Bath Iron Works for installation on the U.S. Navy’s most modern surface combatant, the future USS Zumwalt,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1645 sec (6 req/sec)