EBDG-Designed M/V HENRY ISLAND Launched

Tuesday, July 08, 2003
A new vessel is operating on the waters of the Puget Sound. Last April, San Juan Ferry & Barge selected Seattle-based Elliott Bay Design Group (EBDG) to complete the Contract Design for a new landing craft, the M/V HENRY ISLAND. In order to deliver the vessel in time for the busy summer season, EBDG designed and lofted the landing craft simultaneously, allowing shipyard Latitude Marine Services of La Conner Washington to begin cutting steel in December 2002. The 81' foot steel vessel measures 70' length on deck, 25' molded beam, and 7' hull depth. The landing craft is equipped with a ramp forward designed for beach loading and can handle loads up to 90 tons. The vessel is U.S. Coast Guard-inspected to 46 CFR Subchapter I for hull construction and Subchapter T for most systems. The main engines are twin John Deere model 6081 each rated 235 bhp at 2100 rpm complete with Twin Disc gear. The team at Latitude Marine Services is very pleased about this project. According to shipyard Project Manager Patrick Gudmundson "This is a perfect project for our first new build. It shows what can be achieved here." In addition to new construction, Latitude Marine has a 100-ton haul out capacity for repair and conversions. For 27 years, San Juan Ferry & Barge has been providing service to islands not served by the state ferry system. Along with the company's M/V NORDLAND, the vessels transport building equipment, fuel, and other custom cargo requiring private barge service.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

PDVSA Charters Another Algerian Crude Cargo

Venezuela's state-run oil company PDVSA has hired a supertanker to load a second 2 million-barrel cargo of Algerian crude, according to preliminary tanker fixture data.

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

NYK Line Joins PNW West Coast Metro Pool

Effective October 20, 2014, NYK Line has become a member of the PNW West Coast Metro Pool (WCMP) operated by Trac Intermodal. The WCMP operates chassis at all major marine terminals,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1237 sec (8 req/sec)