Panama City Dredging Project Underway

Friday, December 27, 2002
The Port of Panama City and the U. S. Corps of Engineers have begun a joint dredging project to deepen Panama City’s entrance channel and turning basin from 32 ft. to 36 ft. Inland Dredging Company of Dyersburg, Tennessee will begin work in the channel in January. The Panama City Port Authority is in the process of bidding the dredging work in the berthing areas. The entire project will cost approximately $8.5 million dollars and be completed by the end of May, 2003. The channel deepening is the first of a series of major improvements underway at the Port of Panama City.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Mayor Garcetti on Ratification of Port Labor Contract

International Longshore and Warehouse Union members have ratified a five-year contract governing pay and work rules at 29 West Coast ports, including those of Los Angeles and Long Beach.

Seaway to Receive Prestigious OECD Award

The St. Lawrence Seaway Management Corporation (SLSMC) announced today that it will receive a prestigious award from the Organization for Economic Cooperation

Indonesia Rolls Out First Green Container Terminal

It was an historic moment for Indonesia when President of Indonesia inaugurated the Lamong Bay Terminal in Surabaya, East Java, operated by state-owned PT Pelabuhan Indonesia III (Pelindo III).

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1113 sec (9 req/sec)