Senesco Wins NY Ferry Terminal Contract

Thursday, August 07, 2003
While building 80,000-barrell, double-hulled liquid fuel barges, Senesco Marine is also working on a piece of a major construction project in New York City. The project is the building of the Pier 79 Ferry Terminal. Senesco Marine has been contracted to build three of the main passenger floats for the Pier 79 Terminal. When complete, the passenger floats will be 104 x 35 ft. The construction project is located on West 39th Street, extending 100 ft. into the Hudson River and surrounding the ventilation towers for the Lincoln Tunnel. This new ferry terminal will include six new ferry slips, a passenger waiting area, retail and restaurant space, administrative offices, outdoor recreation areas, and a bus/taxi drop off area. Trevcon Construction Company incorporated of New Jersey is the general contractor for the job and retained Senesco Marine for the float fabrication.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

ASA Mission Statement Revised to Expand Reach

The American Salvage Association has revised its mission statement to increase its area of influence beyond North America, complemented by a new logo that reflects the expanded direction.

New Chemical Handling Service from Ferguson Group

Tank, Fluid Solutions and Bunded Storage for Dangerous Goods and Chemicals Introduced at Gap Ridge, Karratha.    Ferguson Group Australia, global specialist in offshore DNV 2.

BP Freezes Pay in 2015 to Cut Costs

BP is freezing base pay across the group this year, the latest in a series of steps by oil majors to cut costs in response to sinking oil prices.   Over the past year,

Contracts

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Huisman Cranes for New Maersk Subsea Support Vessels

In December 2014, Huisman secured a contract from COSCO (Dalian) Shipyard for the delivery of four customized 400mt Rope Luffing Knuckle Boom Cranes and two 100mt

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4664 sec (2 req/sec)