Senesco Wins NY Ferry Terminal Contract

Thursday, August 07, 2003
While building 80,000-barrell, double-hulled liquid fuel barges, Senesco Marine is also working on a piece of a major construction project in New York City. The project is the building of the Pier 79 Ferry Terminal. Senesco Marine has been contracted to build three of the main passenger floats for the Pier 79 Terminal. When complete, the passenger floats will be 104 x 35 ft. The construction project is located on West 39th Street, extending 100 ft. into the Hudson River and surrounding the ventilation towers for the Lincoln Tunnel. This new ferry terminal will include six new ferry slips, a passenger waiting area, retail and restaurant space, administrative offices, outdoor recreation areas, and a bus/taxi drop off area. Trevcon Construction Company incorporated of New Jersey is the general contractor for the job and retained Senesco Marine for the float fabrication.
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

KEP Marine Unveils KMGBL

KEP Marine – the manufacturer of type approved displays, computers and peripherals, announced  the release of the affordable, high-quality KMGBL Glass Bridge Light Displays.

New Load Measurement Solution for Port of Dampier

Strainstall designs and delivers a load measurement solution for the world’s largest floating wharf at Port of Dampier.   Strainstall, part of James Fisher and Sons plc,

Rolls-Royce Power Package for USS Zumwalt

Rolls-Royce announced delivery of the twin fixed pitch propellers to Bath Iron Works for installation on the U.S. Navy’s most modern surface combatant, the future USS Zumwalt,

Contracts

Voyager IP Wins Irish Navy Satellite Contract

Voyager IP, the Irish marine telecoms solutions specialist, has partnered with the Irish National Space Center to win a €500,000 contract to manage the entire satellite

Carnival’s Costa Brand Orders Two LNG Cruise Ships

Costa’s two new cruise ships will be the largest ever built based on guest capacity; Costa will join sister brand AIDA Cruises in building the first-ever cruise

New Load Measurement Solution for Port of Dampier

Strainstall designs and delivers a load measurement solution for the world’s largest floating wharf at Port of Dampier.   Strainstall, part of James Fisher and Sons plc,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Port Authority Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1511 sec (7 req/sec)