MSC Awards $400M Contract for LMSR Operation

Monday, August 12, 2002
On August 5, MSC awarded Maersk Line, Limited, of Norfolk, Va., a five year contract that could total $400 million to operate and maintain eight large, medium-speed, RoRo ships that strategically preposition Army equipment in the Indian Ocean near Diego Garcia. MSC’s Propositioning Program has 35 strategically located ships laden with military equipment, supplies and fuel for the U.S. Army, Air Force, Navy, Marine Corps and Defense Logistics Agency. Fifteen ships carry combat equipment and sustaining supplies for the U.S. Army, enough to sustain two Army heavy brigades- up to 8,000 personnel- for up to 30 days.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

U.S. Shipbuilding: ESG Nabs Two Z-Drive Tug Contracts

Eastern Shipbuilding (ESG) said that Suderman & Young Towing Company and Bay Houston Towing Company each exercised one additional Z-Drive Tug to be built at ESG.

Nordic Wins with Noble

Nordic Maritime, a leading offshore service operator, today announced a five year time charter for its DP2 IMR Subsea vessel, Mokul Nordic, which has been awarded by Noble Energy,

PDVSA Charters Another Algerian Crude Cargo

Venezuela's state-run oil company PDVSA has hired a supertanker to load a second 2 million-barrel cargo of Algerian crude, according to preliminary tanker fixture data.

New Products

Alu Design to Create Next Generation of Marine Chairs

There’s a new designer in the driving seat at Alu Design. Per Ivar Selvaag, the former Lead Designer at BMW Group and Chief Designer of Peugeot’s concept car division,

NMEA Awards Top Electronic Makers

Marine electronics experts named 11 products in nine categories as winners of the 2014 NMEA Product Awards. Once again, Furuno USA was named Manufacturer of the Year--Support.

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

 
 
Maritime Security Maritime Standards Naval Architecture Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1634 sec (6 req/sec)