Canal Corporation Awards Contract

Tuesday, November 15, 2005
New York State Canal Corporation announced that the contract for a new hydraulic cutter-head dredge has been awarded to Ellicott Dredges of Baltimore, Md. The acquisition of the new dredge is a part of the Canal Corporation's ongoing effort to upgrade its fleet and increase its dredging capacity, while complying with environmental regulations. The new dredge will be stationed in Utica, NY and will replace a 1927 DeLaVergne. The new dredge will have double the horsepower of existing dredge, which is aimed to provide less down-time for repairs and maintenance. Delivery is scheduled for May 24, 2006. The newest dredge in the Canal Corporation's fleet is currently a 1980 Ellicott based in Waterford, NY. With that exception, the remainder of the existing fleet is comprised of dredges of the 1920s or 1930s vintage. The Canal Corporation will continue to pursue upgrades of its dredging fleet. Plans are underway for a hydraulic off-loader in the fall of 2006. This equipment would allow dredge spoil to be pumped as slurry into hopper barges, which would then be transported to disposal sites and pumped upland hydraulically. Unlike other inland waterways throughout the country, maintenance responsibility for the canal system falls on the State of New York, rather than the U.S. Army Corps of Engineers. Part of the Canal System, from Waterford to Oswego, is a federally improved project, through maintenance of the channel is not federally funded. The project depth for the federally improved portion of the waterway is 14 ft. (13 ft. over sills) and 12 ft. elsewhere. The Canal Corporation estimates a backlog of more than10 million cubic yards of sediment which requires removal in order to restore the Canal channels to those depths.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Dredging

Van Oord acquires 100% control of Dravo

Van Oord has acquired all shares of its Spanish subsidiary Dravo S.A.  Dravo S.A. has been owned, since 1987, by Van Oord (50%) and the Spanish company Dragados S.

US FMC Commissioner Visits Panama Canal Expansion Sites

Counsel to the U.S. Federal Maritime Commission informs that  Commissioner William P. Doyle has recently surveyed the construction site on a visit to the Pacific-side of the expanded Panama Canal.

Construction of Changi East Finger Extension

The working period for the construction of Changi East Finger Extension has been extended, GAC said in its daily Hot Port News report. The works will now be conducted from April 25 to October 24,

 
 
Maritime Security Maritime Standards Naval Architecture Pipelines Port Authority Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2033 sec (5 req/sec)