U.S. Oil and Gas Production Still Recovering

Tuesday, November 15, 2005
Oil and natural gas production from the storm-battered Gulf of Mexico continues to recover, Reuters reports. Around 727,000 barrels per day, or 48.47 percent of the Gulf's 1.5 million bpd of crude production, remained shut, along with 3.742 billion cubic feet per day, or 37.42 percent of the region's natural gas output, the report said. The complete recovery of the region's energy operations will take until the middle of 2006, about three months longer than previously estimated. Oil and gas production platforms and undersea pipelines took a severe beating from hurricanes Katrina and Rita. Since Aug. 26, hurricanes have shut more than 85 million barrels of crude production -- the equivalent of about four days of U.S. consumption. Source: Reuters
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Intelligent Fender System Completes Offshore Trial

Strainstall, part of James Fisher and Sons plc, announced the completion of the world’s first Intelligent Fender System (IFS) trial with energy companies SSE and RWE at Suffolk-based wind farm,

Maritime Tension Dominates Southeast Asia Summit

Southeast Asian leaders edged closer to open criticism of China's land reclamation in the disputed South China Sea at a regional summit on Monday, as the Philippines

JSMEA Offers Access to Japan’s Offshore Suppliers

New website and brochure provide a comprehensive list of Japanese suppliers to the offshore industry The Japan Ship Machinery and Equipment Association (JSMEA)

LNG

Drydocks World Wins Dubai Chamber CSR Label

Drydocks World group the leading provider of maritime and offshore services to the shipping, oil, gas and energy sectors has received the Dubai Chamber Corporate

Skangass Celebrates Topping Up

Nordic liquefied natural gas operator Skangass  has celebrated a topping out ceremony at its Pori LNG terminal. The company said it was making progress in the

H-Energy to Build Floating LNG Terminal in West Bengal and Canada

Business Standard reported that real estate developer Hiranandani Group plans to set up a INR 2,400 crore floating LNG import terminal off Haldia, West Bengal

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0851 sec (12 req/sec)