U.S. Oil and Gas Production Still Recovering

Tuesday, November 15, 2005
Oil and natural gas production from the storm-battered Gulf of Mexico continues to recover, Reuters reports. Around 727,000 barrels per day, or 48.47 percent of the Gulf's 1.5 million bpd of crude production, remained shut, along with 3.742 billion cubic feet per day, or 37.42 percent of the region's natural gas output, the report said. The complete recovery of the region's energy operations will take until the middle of 2006, about three months longer than previously estimated. Oil and gas production platforms and undersea pipelines took a severe beating from hurricanes Katrina and Rita. Since Aug. 26, hurricanes have shut more than 85 million barrels of crude production -- the equivalent of about four days of U.S. consumption. Source: Reuters
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

CBP Aircraft Locates Vessel in Distress

U.S. Customs and Border Protection Office of Air and Marine agents assigned to the North Dakota Air Branch have located four people on Red Lake after a call

EMGS Reports 2Q and 1H 2014 Results

Electromagnetic Geoservices ASA's (EMGS) reported revenues of USD 42.5 million in the second quarter 2014, down from USD 61.3 million in the first quarter this year and from USD 44.

Transocean Fleet Update Summary

Transocean Ltd. today issued a monthly fleet update summary which includes new contracts, changes to existing contracts and changes in estimated planned out-of-service

LNG

Banking on US Shale Gas Boom, Asia Petrochemical Firms Switch to LPG

Asia petrochemicals firms are building tanks and retooling plants to store and process liquefied petroleum gas imported from the United States, counting on a flood

Mozambique: $30b Invested for 2018 LNG Export

More than $30 billion will be invested initially in Mozambique's natural gas sector to build capacity to produce 20 million tonnes per year of liquefied natural gas (LNG),

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

 
 
Maritime Security Maritime Standards Naval Architecture Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0922 sec (11 req/sec)