U.S. Oil and Gas Production Still Recovering

Tuesday, November 15, 2005
Oil and natural gas production from the storm-battered Gulf of Mexico continues to recover, Reuters reports. Around 727,000 barrels per day, or 48.47 percent of the Gulf's 1.5 million bpd of crude production, remained shut, along with 3.742 billion cubic feet per day, or 37.42 percent of the region's natural gas output, the report said. The complete recovery of the region's energy operations will take until the middle of 2006, about three months longer than previously estimated. Oil and gas production platforms and undersea pipelines took a severe beating from hurricanes Katrina and Rita. Since Aug. 26, hurricanes have shut more than 85 million barrels of crude production -- the equivalent of about four days of U.S. consumption. Source: Reuters
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

Total CEO Killed in Moscow Runway Accident

Private jet collided with snow plow during takeoff; Total's CEO a defender of Moscow policies. Insiders Boisseau and Pouyanne long seen as potential successors.

Statoil: New Oil in the Grane Area

Statoil has together with PL169 partners proved new oil resources in the D-structure in the vicinity of the Grane field in the North Sea.   Well 25/8-18 S, drilled by the rig Transocean Leader,

LNG

Weak Oil Threatens US Export of LNG

Plunging global oil prices may turn hopes for cheap liquefied natural gas supplies from the United States into a costly disappointment for Asian buyers who have

Singapore’s MPA Discuss LNG Bunkering

The Maritime and Port Authority of Singapore (MPA), Antwerp Port Authority, Port of Rotterdam and Port of Zeebrugge participated in a Liquefied Natural Gas (LNG)

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1245 sec (8 req/sec)