Russia Relying on Offshore for Future Production

Thursday, May 04, 2006
Sakhalin Island currently is the oil and gas growth engine for Russia, which will rely on offshore regions for new production after 2010, the Oil & Gas Journal reported. By 2020, offshore fields could account for 20% of Russia's total oil and gas output. However, Russia must implement regulations and taxes before its offshore oil and gas assets can be developed since offshore royalty issues remain largely unaddressed. The Russian Duma is working on the Mineral Extraction Law and on a new subsoil law. The Russian government's anticipated shift to holding auctions for oil and gas blocks instead of tenders now appears unlikely. International oil and gas companies operating in Russia probably will be prevented from taking more than 49% interest in offshore fields. Two-stage tender offers are expected by 2010, involving 32 blocks in the Barents, Okhotsk, and Pechora seas. OAO Gazprom plans to liquefy gas in Russia from Shtokman gas and condensate field, awaiting development in the Barents Sea. Partners for Shtokman have yet to be announced. Royal Dutch Shell PLC, parent of Sakhalin Energy Investment Co. Ltd.'s lead partner, has said costs for the Sakhalin II Phase 2 might reach $20b, twice the original estimate for the entire Sakhalin II project. The project also has encountered delays related to environmental issues. Shell plans to start year-round oil production, which depends on pipeline construction, in late 2007 and LNG sales in the summer of 2008. Sakhalin II produces about 80,000 b/d during summer, with oil moving to Japan via tanker. Two thirds of Russia's future offshore production is expected to come from the Barents Sea and Kara Sea. (Source: Oil & Gas Journal)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Transocean Posts Quarterly Profit on Cost Cutting

Offshore rig contractor Transocean Ltd posted a quarterly profit, compared with a year-earlier loss, as cost cutting helped counter a slump in crude oil prices.

Skandi Paraty Delivered and On-hire

Skandi Paraty, owned by Norskan Offshore Ltda, has been delivered from the yard and went on-hire on a four years contract with Petrobras.   Skandi Paraty is an AHTS,

ABB Transformers for the Most Powerful Wind Turbines

ABB will deploy 40 special transformers to equip wind turbines for an offshore wind farm in the Irish Sea. The MHI Vestas Offshore Wind turbines are 195 m (640

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Pipelines Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0924 sec (11 req/sec)