Manitowoc Awarded Tank Barge Contract

Wednesday, November 23, 2005
The Manitowoc Company announced that its Bay Shipbuilding subsidiary has been awarded a new construction contract from Harley Marine Services, Inc. to build an ocean-class, double-hull, hot oil tank barge. The 80,000-barrel capacity barge, which is scheduled for delivery in the fourth quarter of 2006, will measure 369 ft. in length, 78 ft. in width, and 33 ft. in molded depth. The Harley contract also includes an option for a second identical vessel. Other contract terms were not disclosed. The Harley barge is the tenth double-hull tank barge built by the Manitowoc Marine Group. The vessel features a flush deck design and is equipped with an onboard heating system to maintain consistent cargo temperatures of 160 degrees F. It will also be ABS, U.S. Coast Guard, and OPA- 90 compliant.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

French PM: Aussie Subs to be built in Australia

French Prime Minister Manuel Valls said on Monday he was committed to building all of a new Australian submarine fleet in Australia, apparently contradicting the

Asia-N.Europe Box Rates Jump 170 pct

Shipping freight rates for transporting containers from ports in Asia to Northern Europe jumped 170 percent to $732 per 20-foot container (TEU) in the week ended on Friday,

NAT Acquires Four 150,000dwt Tankers

Nordic American Tankers Limited ("NAT" or the "Company") announced today that it has entered into an agreement to acquire four existing Suezmax sister vessels built in Japan at a world-class shipyard.

Barges

American Waterways Operators Elects Chairman

The members of the American Waterways Operators, the national trade association representing the tugboat, towboat and barge industry, elected a new slate of leaders

USCG Uses Skiff Ice Boat to Rescue Injured Man

The U.S. Coast Guard medically evacuated a man off of a dredging barge in Lake Erie near Sandusky, Ohio, Wednesday evening. At approximately 5:45 p.m., a good

New Tank Barge Delivered to Harley Marine

The newly built tank barge, the Fight A.L.S., was delivered to Harley Marine Services on February 19, 2016.   Designed by Elliott Bay Design Group (EBDG) and constructed at Vigor Fab in Portland,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0743 sec (13 req/sec)