Northrop Grumman Awarded $1.94B Contract

Wednesday, November 30, 2005
The U.S. Navy has awarded Northrop Grumman Corporation a contract valued at approximately $1.94 billion for the refueling and complex overhaul of the aircraft carrier USS Carl Vinson (CVN 70).

The work will be performed by the company’s Newport News sector and will include the refueling of the ship’s reactors, as well as extensive modernization work to more than 2,300 compartments and hundreds of systems. In addition, nearly 3,000 valves will be replaced and another 600 will be overhauled in various ship systems. Major upgrades will be made to the flight deck, catapults, combat systems and the island. The top two levels of the island will be removed and replaced with a reconfigured structure to provide enhanced operability and support a new antenna mast designed for more modern sensors. “This project is very large and complex, and requires a tremendous Newport News and Navy team effort,” said Ken Mahler, vice president of aircraft carrier overhauls for Northrop Grumman Newport News. “We’ll touch almost every piece of the ship, refurbishing existing equipment and installing the latest advancements in technology to increase and modernize Vinson’s capabilities and mission effectiveness when she returns to the fleet for another 23 years of service.”

Work is scheduled to last more than three years and will be the ship's one and only refueling and complex overhaul in a 50-year life span. Vinson is the third ship of the Nimitz class to undergo this major life-cycle milestone. The ship arrived at the company’s Newport News sector on Nov. 11. More than 3,500 Northrop Grumman Newport News employees will be working aboard Vinson during peak periods of the project. Named for former U.S. Rep. Carl Vinson, the carrier Vinson was built at Northrop Grumman Newport News and christened in 1980. The congressman attended the christening ceremony at age 96 and became the first living American to have a Navy ship named in his honor. The ship was commissioned by the Navy in 1982.

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Wärtsilä to Begin Building LNG Terminal in January

Wärtsilä has been given full notice to proceed (NTP) from Manga LNG Oy for the supply of a liquefied natural gas (LNG) import terminal in Tornio, Northern Finland.

Polarcus Awarded 3D Project Off West Africa

Polarcus Limited has signed a letter of intent with Perenco Oil & Gas Gabon S.A. for a 3D marine seismic acquisition project offshore West Africa.   The project,

Boskalis, VolkerWessels Win Offshore Wind Farm Work

Royal Boskalis Westminster N.V., in partnership with Volker Stevin International (VolkerWessels), has been awarded a contract by Iberdrola Renewables Offshore Deutschland

Shipbuilding

Damen Outfitting First of Nine Bahamas Patrol Boats

The first of nine Damen Stan Patrol 3007s ordered by the Royal Bahamas Defense Force has arrived at Damen Shipyards Gorinchem in the Netherlands for outfitting.

Liquefaction Terminals to Dominate LNG Capital Expenditure

Capital expenditure (Capex) on global LNG facilities is expected to total $259 billion (bn) over the period 2015-2019, with investments expected to be 88% larger

New Chinese Shipyard Launches First Ship

The new shipyard facility of Honghua Offshore Oil & Gas Equipment Company in Jiangsu, China, has launched its first ship, an IMT982 Platform Supply Vessel. The vessel,

 
 
Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3220 sec (3 req/sec)