Derecktor Shipyards Chosen By SENESCO For Subcontract

Monday, November 28, 2005
Derecktor Shipyards has been selected by Southeastern New England Shipbuilding Company (SENESCO) to provide construction support on a 140,000 barrel fuel barge project. Derecktor garnered the job as a result of their unique ability to bend one inch thick steel in the compound curves required on the project. Derecktor will build the bow section as well as roll the plate for both the stern and the section just aft of the bow. "Being chosen for the job by SENESCO, a leader in double-hulled barge construction and itself a specialist in steel fabrication, is a gratifying endorsement of our abilities and our record of delivering for the customer" commented Derecktor General Manager Gavin Higgins. The work will be done at Derecktor's 23-acre Bridgeport CT facility and is expected to be completed in March 2006.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Ballast Water System Retrofits for 11 Containerships

Eleven container vessels owned by Bernhard Schulte GmbH & Co. KG, based in Germany, are to be retrofitted with Wärtsilä Aquarius Ballast Water Management Systems (BWMS), Wärtsilä announced today.

Timing in Doubt on Hapag-Lloyd IPO

German container shipping group Hapag-Lloyd has taken further steps in preparation of a stock market listing and has mandated more banks for the move, but it remains

Asia Tankers-VLCC Rates Will See More Volatility

VLCC market to be "hot" in Q4 -VLCC broker. Freight rates for very large crude carriers (VLCCs) face a roller-coaster ride on uncertain cargo volumes and vessel

Environmental

Ballast Water System Retrofits for 11 Containerships

Eleven container vessels owned by Bernhard Schulte GmbH & Co. KG, based in Germany, are to be retrofitted with Wärtsilä Aquarius Ballast Water Management Systems (BWMS), Wärtsilä announced today.

U.S. Coast Guard Responds to Collision Near Paducah

On-scene assessment teams have reported the maximum estimated potential clarified slurry oil released from the tug collision is now 250,000 gallons, Thursday. The

Occurrence of Humpback Whales at Franz Josef Land Recorded

Scientists first documented occurrence of humpback whales near the archipelago of Franz Josef Land. Experts attribute this to the successful development of their populations.

 
 
Maritime Security Maritime Standards Navigation Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1213 sec (8 req/sec)