Operations Continue on Asphalt Barge that Leaked in James River

Wednesday, November 30, 2005
The Coast Guard continues to monitor a barge that ran aground and spilled approximately 42,000 to 63,000 gallons of liquid asphalt, five miles south of Richmond, Va., at 4:30 a.m. Monday. The Piney Point was being pushed up river, toward Richmond, by the tug Barbary Coast when it ran aground in the vicinity of Meade Landing State Park. The barge was transporting approximately 930,000 gallons of asphalt when it ran aground. The other seven tanks on board were reportedly not damaged, and workers from the scene report the barge is not leaking. Divers assessed damage to the hull today, and a plan is being developed for patching the hole. Additional equipment will also arrive this morning to further stabilize the barge and prepare for the removal of the remaining cargo, which is scheduled to begin Wednesday. The James River is open to single-barge and recreational traffic only from mile marker 156 to 158. Single-barge traffic must contact the Coast Guard command center at Sector Hampton Roads before transiting the area. The Coast Guard Cutter Chock, homeported in Portsmouth, Va., is patrolling the two-mile safety zone around the barge. Recreational traffic must get permission from the crew of the Chock before transiting the area. The response to this incident is a unified effort, with resources on scene from federal, state and local agencies, as well as representatives from both the barge and tug owners. The barge Piney Point is owned by Vane Line Bunkering, of Baltimore; the tug Barbary Coast is owned by Dann Towing, of Chesapeake City, Md. The cause of the incident is under investigation.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Coast Guard

Coast Guard tactical air squadron holds change of command ceremony

Capt. Kevin P. Gavin relieved Capt. Donna L. Cottrell as commanding officer of Coast Guard Helicopter Interdiction Tactical Squadron Jacksonville during a change of command ceremony at HITRON Friday.

Homeland Security Secretary Visits Ingalls Shipbuilding

Huntington Ingalls Industries' Ingalls Shipbuilding division apprises it has hosted a visit by Secretary of Homeland Security Secretary Jeh Johnson and U.S. Rep.

Stranded Virginia Beach Bulker Salvage Plan Set

The Coast Guard advises it is in the final stages of reviewing a salvage plan that is scheduled to begin Friday morning to move the 751-foot bulk carrier, 'Ornak',

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1044 sec (10 req/sec)