Northrop Grumman Redelivers USS George Washington

Tuesday, December 20, 2005
Northrop Grumman Corporation has redelivered the USS George Washington (CVN 73) to the U.S. Navy following a 10-and-a-half-month maintenance availability. The work was performed by the company's Newport News sector and the ship was redelivered after two days of successful sea trials, a series of operational tests to demonstrate the carrier is fully mission capable. "This availability has been, from the beginning, marked by open and honest communication between 'GW' and the shipyard," said Capt. Garry R. White, commanding officer of the USS George Washington (CVN 73). "This, combined with unprecedented teamwork and spirit of cooperation, has resulted in a remarkably successful maintenance period. I could not be more proud of all those involved." "The performance of the Newport News and Navy team during this availability has been exceptional," said Ken Mahler, vice president of aircraft carrier overhauls at Northrop Grumman Newport News. "Our team goals of quality work completed safely, on or ahead of schedule and below budget, have been achieved." The George Washington arrived at the Newport News shipyard on Jan. 28 for the availability, which included dry-docking for approximately seven months. Work included repair and refurbishment of the hull, sea chests, shafting, propellers, and rudders; blasting and coating of numerous tanks; modernization of spaces to support the F/A-18 Super Hornet aircraft equipment and weapons stowage systems; enhancements to crew living areas; scheduled maintenance on propulsion plant systems; and repair and inspections on a variety of ship systems.
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

USA Urged Not to Delay Arctic Drilling

The U.S. should immediately begin a push to exploit its enormous trove of oil in the Arctic waters off of Alaska, or risk a renewed reliance on imported oil in the future, reports AP.

JV Wins $2bln Freeport LNG Contract in US

A joint venture (JV) between CB&I, Chiyoda International and Zachry Industrial has won a contract worth over $2bn from FLNG Liquefaction 3 for a liquefied natural

Viking Bags Charter Deal for AHTS Brage Viking

Viking Supply Ships has entered into a contract with an Oil major for the charter of “Brage Viking” commencing 1stof April 2015. The duration is for 2 years and 8 months firm,

Navy

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Vietnam's Submarines to Counter China?

Vietnam's new submarines could alter the balance in the South China Sea quite dramatically, say maritime security analysts.   Vietnam and China have long contested

India May Add Japanese Soryu-Class Submarines to its Fleet

India is reportedly considering a project to incorporate six Japanese Soryu-class diesel-electric submarines into its fleet, says The Japan Times.   The Defense

 
 
Maritime Contracts Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1224 sec (8 req/sec)