QM 2 Resumes Voyage after Accident.

Thursday, January 19, 2006
The Queen Mary 2 was headed out to sea on Tuesday when the ship returned to Port Everglades after a problem was discovered with a motor. According to the Miami Herald, the cruise ship hit a sea wall, damaging part of its propulsion system. Shortly after the ship's 1 p.m. departure from Port Everglades, a bridge instrument indicated there was a problem with one of four propulsion motors. The captain called the U.S. Coast Guard more than three hours later and said there was reason to believe the ship hit a submerged object when it was about five miles out. About 10 p.m., tugboats pulled the ship back to the port, where the vessel remained for two days. The ship left New York on Sunday and stopped in Fort Lauderdale to pick up more passengers as it continued on for a 38-night South American odyssey, originating in New York and ending in Los Angeles. None of the ship's 2,543 passengers was injured. (Source: www.sun-sentinel.com, www.miami.com)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

ABP orders Two Gottwald cranes

Terex Port Solutions (TPS) has received an order from Associated British Ports (ABP) for two electric Terex Gottwald Model 8 portal harbour cranes in the G HSK 8424 B four-rope grab variant.

POSH Bags Shell FLNG Contract

Singapore’s offshore marine services provider PACC Offshore Services Holdings Ltd. (POSH) has been awarded a contract to support Shell’s Prelude floating liquefied

Baltic Index up for Third Straight Session

The Baltic Exchange's main sea freight index, tracking rates for ships carrying dry bulk commodities, rose on Friday, for a third straight session, on rising demand across all vessel segments.

News

HCI Capital Renamed Ernst Russ AG

A vote was passed at the ordinary shareholders’ meeting of HCI Capital AG yesterday to change the company’s name to Ernst Russ AG. The Executive Board and Supervisory

ABP orders Two Gottwald cranes

Terex Port Solutions (TPS) has received an order from Associated British Ports (ABP) for two electric Terex Gottwald Model 8 portal harbour cranes in the G HSK 8424 B four-rope grab variant.

Traffic Separation Schemes off Western Australia

On 1 December 2016 two new Traffic Separation Schemes (TSS) will come into effect off the south-west coast of Western Australia. Australia’s proposal to establish

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0933 sec (11 req/sec)